DON'T WANT TO MISS A THING?

Certification Exam Passing Tips

Latest exam news and discount info

Curated and up-to-date by our experts

Yes, send me the newsletter

Huawei H13-221 Exam Questions and Answers, HCIP-Kunpeng Computing | SPOTO

SPOTO's latest exam dumps on the homepage, with a 100% pass rate! SPOTO delivers authentic Cisco CCNA, CCNP study materials, CCIE Lab solutions, PMP, CISA, CISM, AWS, and Palo Alto exam dumps. Our comprehensive study materials are meticulously aligned with the latest exam objectives. With a proven track record, we have enabled thousands of candidates worldwide to pass their IT certifications on their first attempt. Over the past 20+ years, SPOTO has successfully placed numerous IT professionals in Fortune 500 companies.
Take other online exams

Question #1
A, as the company's information director, after purchasing a large number of Huawei RH series servers, wants to use a set of software for local management of all Huawei servers. Which of the following software would you choose?
A. eService
B. SmartProvisioning
C. Fusion Directorcorrect
D. SmartKit
View answer
Correct Answer: C
Question #2
Which of the following statements about HPC high-performance computing application scenarios is incorrect?
A. Scale-Up Architecture
B. Prefer loosely coupled patternscorrect
C. Scale-Out Architecture
View answer
Correct Answer: B
Question #3
Engineer A wants to improve work efficiency for the software upgrade of 58 servers at a certain site. Which software can be used for batch processing?
A. BIOS
B. SmartKitcorrect
C. iBMC
View answer
Correct Answer: B
Question #4
Heterogeneous computing supports Intel's latest generation of CPUs and the current mainstream Platinum processors, and is mainly suitable for which scenarios?
A. Suitable for moderate loads with Intel Turbo Boost and Hyper-Threading technology
B. Entry-level performance and cost-effective, suitable for light loads
C. High-performance general-purpose computing, storage, and networking
D. Real-time analysis and artificial intelligencecorrect
View answer
Correct Answer: D
Question #5
The RAID controller card provides functions such as RAID support and level migration, which of the following functions cannot be provided by RAID 1E?
A. Independent installation of the operating system, high-speed startupcorrect
B. Web remote setting function
C. RAID configuration memory
D. RAID self-diagnosis
View answer
Correct Answer: A
Question #6
To meet the requirements of high-capacity and high-performance storage for banking operations, rack servers adopt which storage method?
A. Tieringcorrect
B. Partitioning
C. Module management
D. Layering
View answer
Correct Answer: A
Question #7
The configuration of the fan in the server is used for heat dissipation and power reduction. The rack server 2288 V5 has 7 hot-swappable counter-rotating fans, that is, fans in ( ) connected in series, and rotate in ( )
A. 7, clockwise
B. 14, counterclockwise
C. 14, clockwisecorrect
D. 14, clockwise and counterclockwise
E. Counterclockwise
View answer
Correct Answer: C
Question #8
Which of the following does not belong to the Fusionserver pro server?
A. OceanStor9000correct
B. High-density server X6000
C. Mission-critical server Kunlun
D. Smart Engine FPGA
View answer
Correct Answer: A
Question #9
Smart Provisioning provides functions such as installing the operating system without an optical drive, configuring RAID, and performing upgrades. Which feature of the following is not supported by Smart Provisioning?
A. Hard disk diagnostics
B. Log collectioncorrect
C. Firmware upgrade for PCIe devices including RAID cards and NICs
D. Importing and exporting configurations for iBMC, BIOS, RAID cards, and HBA cards
View answer
Correct Answer: B
Question #10
Engineer A, during the early stage of project planning, estimates the power consumption of Huawei servers to determine the power supply for the data center. Which tool should be used?
A. Huawei Server Power Consumption Calculatorcorrect
B. Huawei Server Compatibility Query Assistant
C. Huawei Server Product Documentation
D. Huawei Server Management Software Compatibility Query Assistant
View answer
Correct Answer: A
Question #11
Which of the following is a terminal product in the form of a developer board with the Atlas AI acceleration module as the core?
A. Atlas 300T training card
B. Atlas 500 smart edge station
C. Atlas 3001 reasoning card
D. Atlas 200 DKcorrect
View answer
Correct Answer: D
Question #12
For the environmental survey of the computer room, it is necessary to pay attention to whether the climatic conditions (such as temperature and humidity in the computer room, etc.), the biological environment conditions (potted green plants, etc.), and the conditions of corrosive gas pollutants (such as H2S, NOX) meet the requirements.
A. TRUEcorrect
B. FALSE
View answer
Correct Answer: A
Question #13
Engineer A found a 2488 V5 and a 2288 V5 similar in appearance in the computer room. After consulting the documents, he found that one was a 2-way server and the other was a 4-way server. Compared with a 2-way server, the advantage of a 4-way server is?
A. 2U space is equipped with 4 scalable processors, which doubles the computing density compared to 2 sets of 2-socket serverscorrect
B. Support up to 24+ full NVMe or 16 SAS+8 IVWE/SAS mixed slots
C. The power supply and fan support hot swap
View answer
Correct Answer: A
Question #14
In the SAP HANA SystemReplication solution, which of the following statements is correct regarding the cross-site SystemReplication (secondary cascade) site (Datacenter) disaster recovery scenario?
A. On the basis of the first site with dual-machine HA, deploy a disaster recovery site at the second remote sitecorrect
B. Disaster recovery scenarios implemented by third-party disaster recovery software
C. Through system replication to solve the scene where the main system appears in the entire database system crash, including hard disk damage
View answer
Correct Answer: A
Question #15
Engineer A learned during server selection that all Huawei servers now use the second-generation Intel Xeon processors. Which of the following statements about Xeon processors is incorrect?
A. Gold type is suitable for high performance general computing, storage, network
B. There are four grades of Xeon processors - Diamond, Gold, Silver, Bronze, which are suitable for different application scenarioscorrect
C. Silver for intel Turbo Boost and Hyber Threading technology for moderate loads
View answer
Correct Answer: B
Question #16
There are various signs on each server equipment, such as warning signs, grounding signs, and anti-static signs. Which of the following signs is wrong identified and understood by Engineer A? icon 1 icon 2 icon 3 Icon 4
A. Icon 1 means anti-static sign, please do not touch the device with bare hands
B. Icon 3 means the internal grounding sign, indicating that the equipment must be grounded through the grounding point to ensure the normal operation of the equipment and ensure the personal safety of the operator
C. Icon 2 means a warning sign, which indicates that mis-operation may cause equipment damage or personal injury
D. Icon 4 means the altitude mark, which means that the device is only suitable for safe use in areas below 2000m above sea levelcorrect
View answer
Correct Answer: D
Question #17
Which processes are unnecessary in the configuration process of the management module of the blade server E9000?
A. Check the MM board
B. Modify the initial password
C. Add users
D. Upgrade firmwarecorrect
View answer
Correct Answer: D
Question #18
Which statement about the understanding of the Huawei Server Power Consumption Calculator is incorrect?
A. Users enter configuration information such as the type, model, and quantity of each component and set the load percentage, and the tool quickly calculates the relevant power consumption data
B. This tool can cover all workload types, customer site environments, and provide relatively accurate data in one model
C. The Huawei Server Power Consumption Calculator supports various product models including Huawei blade servers, high-density servers, rack servers, and open architecture minis
D. The purpose of this tool is to serve as a reference for server power distribution, providing hardware measurement data based on typical application scenarios
View answer
Correct Answer: B
Question #19
The management software is layered, and it is divided into three layers. What are the most important two layers below?
A. Server stand-alone management software and infrastructure management systemcorrect
B. Integrated network management system and server stand-alone management software
C. Infrastructure management system and vertical network management system
View answer
Correct Answer: A
Question #20
Which of the following management features does not belong to iBMC?
A. Set the startup item
B. Black box
C. Screen shot
D. Stateless Computingcorrect
View answer
Correct Answer: D
Question #21
A 5885V5 rack server in a certain office fails suddenly. The following alarm information can be viewed on the iBMC management platform. Which one should be diagnosed first?
A. The CPU temperature is too high to trigger frequency reduction-major alarm
B. PSU failure - critical alarmcorrect
C. System failure - critical alarm
D. PCH temperature is too high - minor alarm
View answer
Correct Answer: B
Question #22
Which of the following descriptions about the KUNLUN device panel interface is wrong?
A. The USB interface and VGA interface on the front panel of the central management box can be freely switched between various hard partitions through the command line
B. When 9016 is made into a 16P hard partition, the USB interface and VGA interface on the front panel of the second system computing box can still be used
C. The power-on button on the front panel of the central management frame is only valid for a single system, and the button will be blocked for multiple systemscorrect
D. When a system computing box is divided into two 4P hard partitions, the power-on button on the top of the front panel corresponds to PUIA and the power-on button below corresponds to BPUB
View answer
Correct Answer: C
Question #23
The RH2288V5 server in a site is faulty, and firmware upgrade and refresh are required. The computer room network is faulty, and there is no animation login on the server management network port. Which of the following methods can be used to complete the upgrade?
A. Log in through the serial port and use the command line to perform the upgrade operationcorrect
B. Upgrade via iBMC
C. Upgrade through software such as SmartKit
View answer
Correct Answer: A
Question #24
Which option is not an advantage of heterogeneous computing?
A. Improved compression ratio
B. Support for AI inference
C. CPU offloading
D. Improved transmission ratecorrect
View answer
Correct Answer: D
Question #25
The heat dissipation system of Huawei FusionServer can support air cooling and liquid cooling.
A. TRUEcorrect
B. FALSE
View answer
Correct Answer: A
Question #26
Which of the following is the correct description of the site selection and internal configuration of the computer room?
A. In order to beautify the environment of the computer room and purify the air in the computer room, several pots of green plants were rotated
B. Due to the large area of the computer room, two fire-fighting systems are installed in the computer room: automatic fire alarm system and a large number of portable fire extinguishers
C. Three lighting systems are equipped in the computer room: common lighting, standby lighting and emergency lightingcorrect
D. There is a smelter 2 kilometers away from the computer room
View answer
Correct Answer: C
Question #27
Which software cannot be installed on RH servers?
A. Hadoop
B. oracle
C. Rehdhat Linux
D. AIXcorrect
View answer
Correct Answer: D
Question #28
When performing power on/off operations on Huawei heterogeneous servers, which description is incorrect?
A. Before powering on, ensure that the power switch is in the off state, and all cables are correctly connected, and the power supply voltage meets the requirements of the device
B. If the compute node has just been powered off, wait at least 1 minute before reconnecting the power
C. When powering on, do not plug or unplug hard drive modules, network cables, or console port cables
D. Forcing a power-off while the hard drive is performing read/write operations will not cause bad sectors on the hard drive, but it will damage the data source
View answer
Correct Answer: D
Question #29
After switching to a Huawei server at a certain site, the manpower input for operation and maintenance was greatly reduced. The reason is that the active failure analysis and early warning PFA technology combined with the FDM fault management platform reduces the failure probability of the server.
A. TRUEcorrect
B. FALSE
View answer
Correct Answer: A
Question #30
In the integration verification stage of the design and implementation service process, as the person in charge of the project implementation party A, which of the following items does not need to be considered?
A. Business testing
B. Project transfer
C. Develop an acceptance plan
D. Determine the acceptance plan
E. Acceptance Executioncorrect
F. Transfer of assets
View answer
Correct Answer: E

View Answers after Submission

Please submit your email and WhatsApp to get the answers of questions.

Note: Please make sure your email ID and Whatsapp are valid so that you can get the correct exam results.

Email:
Whatsapp/phone number: