CCIE Written Dumps Pass Update Date Latest Passed Date Dumps
CCIE R&S Pass Oct 19, 2018 Oct 20, 2018 Download
CCIE Security Pass Oct 16, 2018 Oct 18, 2018 Download
CCIE Data Center Pass Oct 15, 2018 Oct 17, 2018 Download
CCIE Wireless Pass Oct 16, 2018 Oct 18, 2018 Download
CCIE Service Provider Pass Oct 14, 2018 Oct 16, 2018 Download
CCIE Collaboration Pass Oct 17, 2018 Oct 16, 2018 Download
CCDE Pass Oct 17, 2018 Oct 16, 2018 Download
CCIE LAB Pass Update Date Details Materials
CCIE R&S Pass Oct 19, 2018 TS: TS1+TS2 DIAG:8 Sets CFG:3 Sets Download
CCIE Security Pass Oct 16, 2018 TS: TS1 DIAG:1 Sets CFG:1 Sets Download
CCIE Data Center Pass Oct 15, 2018 DIAG: 3 Sets CFG:1 Sets Download
CCIE Wireless Pass Oct 18, 2018 DIAG: 1 Sets CFG&TS:1 Sets Download
CCIE Service Provider Pass Oct 14, 2018 TS: TS1+TS2 DIAG:1 Sets CFG:2 Sets Download
CCIE Collaboration Pass Oct 17, 2018 CFG: 2 Sets Download


Cisco Pass Report View More >

CCIE RS Written
Oct 19, 2018
CCIE RS Written
CCIE RS Written
Oct 18, 2018
CCIE RS Written
CCIE Data Center Written
Oct 18, 2018
CCIE Data Center Written
CCIE RS Written
Oct 18, 2018
CCIE RS Written
CCIE RS Written
Oct 17, 2018
CCIE RS Written
CCIE RS Written
Oct 17, 2018
CCIE RS Written
CCIE RS Written
Oct 17, 2018
CCIE RS Written
CCIE RS Written
Oct 17, 2018
CCIE RS Written
CCIE SP Lab
Oct 17, 2018
CCIE SP Lab
CCIE RS Written
Oct 16, 2018
CCIE RS Written

SPOTO CCIE CLUB

SPOTO, founded in 2003, concentrates on Cisco training. Over 15 years, SPOTO helped tens of thousands of candidates achieve their CCNA, CCNP and CCIE certification, conveying numerous IT employees to Fortune 500 companies.
SPOTO stands for Service, Professional, Outstanding, Teamwork and Obtain. SPOTO is dedicated to providing best Service, with Professional and Outstanding Teams to help members Obtain Cisco certification and cutting-edge technology

    CCIE R&S Feedbacks

    TS2 DIAG H3++ CFG H1+

    Q1
    No 10
    No 30
    Ospf: no passive interface
    Dhcp: change to infinite because lease is short

    Q2
    SW 111: ospf cost is 100
    It deleted

    Q3

    This problem did not go well.
    TE will succeed by changing origin.
    However, the displayed AS-path was not displayed
    My result was that the AS number of the third hop was 19999.
    But the question was AS number 65002.

    Q4
    the content of BGP was that it did not touch.
    I changed the route by setting the OSPF cost of R20 Lo 0  is 0 to   100.

    Q5
    R60 subnet is different. / 32 / 24

    Q6
    VLAN 111 was not advertised to OSPFv 3 by SW 111.

    Q7
    The process ID of OSPF was different for R1 Lo 0.
    In R 10 ospf  external was 19.
    It changed to 201.

     There were things
    I was wasted in in ignoring.
    There was a router with mpls ldp router-id lo 0 and mpls label  protocol ldp set in R1 - R6, and a router not configured.

    The route-target imports its own export
    I was worried about  changing.
    However, it was described as separete 2 faults in the problem
    sentence, and traceroute was the result that was requested and I
    ignored it.

    Q8
    SW 300/301: vlan 2000 & 2001 ip dhcp relay information trust
    SW 310: ip arp inspection
    Dhcp: change to infinite because lease is short

    Q9
    Ospf network type is change

    Q 10
    Nat pool was set up.
    I set up the ip nat outside source static 201.99.70.2 . . .  
    Command on R24 and R25 and it was able to telnet.

    DIAG H3++ same   as spoto solutions

    CFG H1+ same

    Read More >>


    TS1 DIAG H2++ CFG H1+

    TS1
    1 - ACL on SW1

    2- ppp and chap config on R17

    3- R22 interface was not in OSPF,
    some problem on R5

    4- very simple, just R12 with a shut interface

    5- always takes me forever.
    I changed many things.
    R22 had bad RID for Ospf,
    R3 had no ospf Nei towards R21

    6- Simple fix to next hop

    7- R18 had ACL on serial interface and was missing some nhrp commands. All routers needed shortcut, R15 needed redirect

    8- Fixed LDP between R1/2,
    bad nat on R8, added cost for interface E2/0 on R4/6,
    fixed dhcp problem on R104

    9- R21 had ACL that needed fixing,
    R24 had bad encryption for tunnel,
    R23 had bad NAT

    10- fixed dhcp config on NAS
    Diag  H2++ - same as spoto

    CFG H1+ - looked like spoto .
    I couldn't solve ssh  R20, did everything as per solution but ssh  was denied

    Couldn't remember encryption commands for DMVPN tunnel on VRF Trace  
    routes worked beautifully Really ran out of time but happy I made it

    Read More >>