SPOTO's latest exam dumps on the homepage, with a 100% pass rate! SPOTO delivers authentic Cisco CCNA, CCNP study materials, CCIE Lab solutions, PMP, CISA, CISM, AWS, and Palo Alto exam dumps. Our comprehensive study materials are meticulously aligned with the latest exam objectives. With a proven track record, we have enabled thousands of candidates worldwide to pass their IT certifications on their first attempt. Over the past 20+ years, SPOTO has successfully placed numerous IT professionals in Fortune 500 companies.
Take other online exams

Question #1
what is typical entrance room power requirement?
A. More than 2000 KW
B. 500, to 1500 watts per access provider
C. More than about Million watts
D. exactly or less than 300KW
View answer
Correct Answer: B
Question #2
According to TIA-942, what is the low temperature that must be maintained in a data center?
A. 75 degrees
B. 65 degrees
C. 68 degrees
D. 70 degrees
E. 60 degrees
View answer
Correct Answer: C
Question #3
What is the first preference regarding utility service, class F4?
A. Lead-acid battery, vented and valve regulated Nickel-cadmium battery, vented and valve regulated
B. Flywheel, vertical and horizontal
C. Lithium-ion battery, sealed and unsealed
D. Supercapacitor, cylindrical and prismatic
View answer
Correct Answer: D
Question #4
What is the recommended amount of fuel supply needing to be available to a class F3 data center?
A. 72 hours
B. 24 hours
C. 48 hours
D. 96 hours
View answer
Correct Answer: A
Question #5
What is the difference between a single bus and a dual bus power distribution system?
A. Single bus is more flexible and adaptable to changing needs than dual bus
B. Single bus has only one power source while dual bus has two independent power sources
C. Single bus is more reliable than dual bus
D. Dual bus is more cost-effective than single bus
View answer
Correct Answer: B
Question #6
What is the recommended amount of fuel supply to be available to a class F4 data center?
A. 72 hours
B. 24 hours
C. 48 hours
D. 96 hours
View answer
Correct Answer: D
Question #7
What are the equipment clearance/access requirements when designing the door openings and loading dock areas for a data center?
A. At least two circuits from one substation, same path
B. At least one circuit from two separate substations, different voltage levels
C. One circuit from one substation, separate paths
D. At least two circuits from two separate substations, diverse substation power grids and separate paths
View answer
Correct Answer: C
Question #8
What is the most common energy storage solution and what are the two types?
A. 20 feet
B. 40 feet
C. 10 feet
D. 30 feet
View answer
Correct Answer: A
Question #9
What is the difference between a hard-wired and a plug-in UPS?
A. Hard-wired UPS is more efficient in terms of power delivery than plug-in UPS
B. Hard-wired UPS is more reliable than plug-in UPS
C. Hard-wired UPS is permanently connected to the electrical system while plug-in UPS can be easily connected and disconnected
D. Plug-in UPS is more cost-effective than hard-wired UPS
View answer
Correct Answer: C

View Answers after Submission

Please submit your email and WhatsApp to get the answers of questions.

Note: Please make sure your email ID and Whatsapp are valid so that you can get the correct exam results.

Email:
Whatsapp/phone number: