SPOTO's latest exam dumps on the homepage, with a 100% pass rate! SPOTO delivers authentic Cisco CCNA, CCNP study materials, CCIE Lab solutions, PMP, CISA, CISM, AWS, and Palo Alto exam dumps. Our comprehensive study materials are meticulously aligned with the latest exam objectives. With a proven track record, we have enabled thousands of candidates worldwide to pass their IT certifications on their first attempt. Over the past 20+ years, SPOTO has successfully placed numerous IT professionals in Fortune 500 companies.
Take other online exams

Question #1
A program manager initiates a new global program to create a higher level of protection for a company's intellectual property. The company exhibits a relaxed culture and environment and is intolerant of processes to the point of being considered process-adverse However, the company's culture is tolerant of long-term program activities, and provided there is continuous progress on improving the protection of its intellectual property Expectations for rapid progress are low What should the program manager do
A. Tailor program sponsor and stakeholder engagement and communications activities to meet the company's expectations
B. Insist on maintaining a set of tightly controlled stakeholder register and engagement plan documents to meet expectations
C. Provide detailed information to the most influential program sponsors and stakeholders
D. Ensure that the component stakeholders have the appropriate level of communications required to meet their needs
View answer
Correct Answer: A
Question #2
The customer of a three-year program does not want to receive any intermediate details on the program. The program appears to be in trouble and the customer is concerned about a new system's cost. The program manager has provided monthly performance reports throughout the program's lite cycle. Which of the following would the customer be interested in reviewing?
A. Estimate to complete
B. Estimate at completioncorrect
C. Original cost baseline
D. Cost performance index
View answer
Correct Answer: B
Question #3
What is the horizontal separation, in well tamped earth, required between power and direct buried telecommunications facilities sharing the same trench?
A. 457 mm (18 in)
B. 381 mm (15 in)
C. 300 mm (12 in)
D. 229 mm (9 in)
E. 152 mm (6 in)
View answer
Correct Answer: C
Question #4
When sizing an underground entrance facility, what is the MINIMUM amount of 103 metric designator conduits (4 trade size) that should be specified by the ICT distribution designer?
A. 2 Conduits
B. 3 Conduits
C. 4 Conduits
D. 6 Conduits
View answer
Correct Answer: C
Question #5
A telephone facility and an electrical facility are required in a tunnel. To reduce the effects of EMI and eliminate the need for additional shielding of the cables, where would each facility be placed?
A. Together on the same pathway for easy access and maintenance
B. One on the top part and one on the bottom part of the same side of the tunnel
C. On the same sides of the tunnel
D. On opposite sides of the tunnel
E. On the exterior of the tunnel
View answer
Correct Answer: D
Question #6
Throughout a multiyear program, component projects are transitioned to the customer. During the project acceptance phase, a potential risk is identified and brought to the program team's attention. What should be done with the identified potential risk?
A. Incorporate it into the risk register and perform a thorough analysiscorrect
B. Mitigate the risk before it is incorporated into the risk management plan
C. Document the risk in the program transition plan and identify it as a potential issue
D. Document it m the issue log and immediately notify the steering committee
View answer
Correct Answer: A
Question #7
You must extend a video systems backbone coax cable that was recently installed. Which of the following coaxial cable types would provide the best performance for both analog and digital video?
A. eries 6
B. eries 11
C. G 16
D. G 59
E. G 62
View answer
Correct Answer: B
Question #8
Which of the following is true about screened twisted pair cable assemblies?
A. he drain wire and screen foil must be bonded at one end only
B. he drain wire and screen foil must be bonded at every connection
C. here is no need to bond the screen foil or drain because it is not important
D. he drain wire and screen foil must be separately bonded at opposite ends
View answer
Correct Answer: B
Question #9
Which type of protection for electrical power stations provide isolation against a rise in potential of station ground and also provide drainage protection against longitudinally - induced voltages?
A. Isolating transformers
B. Neutralizing transformers
C. Mutual drainage reactors
D. Unit - type neutralizing transformers
E. 2 - winding neutralizing transformers
View answer
Correct Answer: A
Question #10
For the telecommunications industry, the nominal operating voltage is ________ volts DC.
A. - 24
B. + 48
C. + 24
D. - 48
View answer
Correct Answer: D
Question #11
Which type of cable tray is best described as a ventilated bottom with side rails?
A. Basket tray
B. Spline
C. Ventilated channel
D. Ladder
E. Ventilated trough
View answer
Correct Answer: E
Question #12
Which is an advantage of stranded conductors over solid conductors?
A. Less costly
B. Simpler terminations
C. Better high frequency performance
D. More flexible
View answer
Correct Answer: D
Question #13
What type of fiber optic cable is manufactured to protect individual glass strands and is primarily designed for use inside buildings?
A. ibbon
B. ight buffered
C. oose tube
D. ir blown
View answer
Correct Answer: B
Question #14
An organization is embarking on a new program aligned with its strategic objectives. The new program has a High level of risk due to the rapidly changing technical landscape in which the organization operates. The organization has mature program management capabilities, as measured by its resources, intellectual assets, and management processes. Given the organization's history of delivering successful programs, what should the program manager do as part of the planning process?
A. Interview the program managers and stakeholders of previous programs to learn from their experiences
B. Review the organization's strategic objectives risk tolerance and compliance processes, which may provide knowledge about past programs
C. Consult the repository developed as part of the organization's knowledge management initiative to capture best practices and lessons learnedcorrect
D. Hire independent industry specialists and subject matter experts (SMEs) to provide additional information about market trends and uncertainties m the external environment
View answer
Correct Answer: C
Question #15
When planning a telecommunication termination area, what is the estimated space needed to terminate 144 strands of optical fiber?
A. 6350
B. 7315
C. 8890
D. 10972
E. 14376
View answer
Correct Answer: B
Question #16
The RJ-45 is now known as the 8P8C style connector, per the Telecommunications Industry Association (TIA) standard. What does the P and C stand for?
A. lug and connector
B. osition and connector
C. osition and contact
D. lug and contact
View answer
Correct Answer: C
Question #17
You are extending 1000 MHz video service from your existing headend to a new equipment room (ER). Your existing incoming video signal is plus (+) 15 dBmV. You have three two- way splitters with a total of minus (-) 15 dB. You are adding 122 m (400 ft) of series 11 (RG 11) cable with a minus (-) 18 dB with eight single end F-connectors with a total of minus (-) 1.2 dB. From the selections below, what is the MINIMUM gain amplifier required in the headend room?
A. lus (+) 15 dB
B. lus (+) 20 dB
C. lus (+) 25 dB
D. lus (+) 30 dB
E. lus (+) 35 dB
View answer
Correct Answer: A
Question #18
A program delivers incremental benefits but is far from closure. The company completes an acquisition and defines new strategic objectives. What should the program manager do next?
A. Evaluate the impact of the new strategic objectives through a change request
B. Integrate the new acquisition into the program to include the new strategic objectives
C. Assess the impact of the new acquisition on the contract management plan
D. Review the benefits management plan to assess the continued validity of the program
View answer
Correct Answer: D
Question #19
A municipal agency manages a city's water and wastewater infrastructure. A regulation requires the replacement of sewer lines throughout the city at a cost of US$2 billion over 30 years The city has been managing this program with various program teams, and has a project controls office In place to track protects separate from the program management team A program manager is hired to standardize all deliverables from component projects under the program. What should the program manager do next?
A. Develop a program management frameworkcorrect
B. Create a program performance analysis report
C. Generate a program charter
D. Establish a program management office (PMO)
View answer
Correct Answer: A
Question #20
What is the MINIMUM clearance needed between the front of the telephone booth and any wall or fixture for most installations?
A. 300 mm (12 in)
B. 450 mm (18 in)
C. 610 mm (24 in)
D. 914 mm (36 in)
E. 2
View answer
Correct Answer: C
Question #21
A large international manufacturing company is centralizing its IT which is currently spread over 16 countries. The transition means physically regrouping the infrastructure and aligning processes and organizations. The high-level scope of this transformation encompasses three main areas. 1. The technology area―assessing which technology/tooling should be retained for the target data center 2. The policies and procedure area-aimed at establishing a common set of processes supporting the new way of deliverin
A. A detailed plan showing dependencies among the constituent protects
B. A comprehensive analysis of the different compensation packages offered in the 16 countries
C. An inventory detailing all physical and logical components in place and the employees in scope
D. A cost/benefit analysis of the different scenarios, presenting their respective contributionscorrect
View answer
Correct Answer: D
Question #22
A regional finance program is impacted by a new currency regulation issued by a country in the region. The new regulation requires changes to the financial statements of that country's branches by the end of the fiscal year Failing to comply with the regulation may result in fines and/or closure of the branches. A branch general manager immediately meets with the program manager to select and secure a local fiscal expert to support the regulation as these types of resources are in high demand. There is a hi
A. Build a coalition with local companies that can influence the government to renegotiate the imposed deadline
B. Create fine and closure scenarios to assess the impact on the program and create a contingency plan
C. Generate a delivery incentive contract with the selected fiscal expert to ensure on-time delivery of the revised financial statements
D. Assess the risk incorporate it in the program's risk management plan and meet with the steering committeecorrect
View answer
Correct Answer: D
Question #23
Exhibit: A pay telephone using coins needs to be installed in a public are a. In the specifications, it is required that the telephone shall meet the ADA (Americans with Disability Act) requirement for side reach using a wheelchair. What will be the maximum reachable height or the value of "X"?
A. 1220 mm (48 in)
B. 760 mm (30 in)
C. 1370 mm (54 in)
D. 1170 mm (46 in)
E. 864 mm (34 in)
View answer
Correct Answer: C
Question #24
For the telecommunications industry, the nominal operating voltage is ________ volts DC.
A. - 24
B. + 48
C. + 24
D. - 48
View answer
Correct Answer: D
Question #25
If looking to specify an optical fiber backbone within a building going 275 m (902 ft) between the equipment room (ER) and the telecommunications room (TR), what type of fiber should be specified to support a 10 GB ethernet application?
A. M1
B. 0 micron multimode
C. 0 micron laser optimized multimode
D. 2
View answer
Correct Answer: C
Question #26
66-style connecting blocks (certain designs) can support up to what category of transmission performance?
A. Category 3
B. Category 5
C. Category 5e
D. Category 6
E. Category 6A
View answer
Correct Answer: C
Question #27
Which of the following is NOT a design consideration for broadband video distribution?
A. mplifier link budgets
B. dhering to the 90 meter (295 feet) rule for horizontal distribution
C. mplifier cascade limitations
D. nvironmental factors
E. rop length
View answer
Correct Answer: B
Question #28
When sizing an underground entrance facility, what is the MINIMUM amount of 103 metric designator conduits (4 trade size) that should be specified by the ICT distribution designer?
A. 2 Conduits
B. 3 Conduits
C. 4 Conduits
D. 6 Conduits
View answer
Correct Answer: C
Question #29
Which device uses circulators or diplexer filters to separate and combine the different transmit and receive RF paths?
A. Transceiver
B. Repeater
C. Bidirectional amplifier
D. Unidirectional amplifier
View answer
Correct Answer: D
Question #30
An R&D group director approves a major program's charter although the director has a high level of understanding of the program's scope (hoy are unsure of how the program manager can be successful in delivering the program's commitments What should the program manager do to align stakeholders with planning and monitoring the program's progress?
A. Establish high-level program milestones
B. Develop an accountability matrix, and assign program roles and responsibilities
C. Generate a supplier management plan to identify external stakeholders
D. Create a communications management plan, and establish reporting formatscorrect
View answer
Correct Answer: D

View Answers after Submission

Please submit your email and WhatsApp to get the answers of questions.

Note: Please make sure your email ID and Whatsapp are valid so that you can get the correct exam results.

Email:
Whatsapp/phone number: