DON'T WANT TO MISS A THING?

Certification Exam Passing Tips

Latest exam news and discount info

Curated and up-to-date by our experts

Yes, send me the newsletter

Pass Your LSSGB Exam with Practice Tests 2024 Updated, Six Sigma Green Belt Certification | SPOTO

Prepare to excel in your LSSGB Exam with our updated practice tests for 2024. Our Six Sigma Green Belt Certification resources, including practice tests, exam questions, sample questions, and exam dumps, are meticulously curated to aid your exam practice. Whether you seek free tests, online exam questions, or exam questions and answers, we provide comprehensive materials to enhance your preparation. Additionally, our mock exams and exam materials are designed to simulate the actual testing environment, ensuring you're fully equipped for success. A Lean Six Sigma Green Belt possesses the expertise to implement, interpret, and apply Lean Six Sigma methodologies proficiently, making our resources invaluable for your preparation. The IASSC Certified Lean Six Sigma Green Belt Exam™, consisting of 100 questions and a 3-hour time limit, requires thorough preparation, and our latest practice tests can significantly boost your chances of passing the certification exam.
Take other online exams

Question #1
A Six Sigma tool that helps to screen factors by using graphical techniques to logically subgroup multiple discrete X's plotted against a continuous Y is known as a _____________Chart.
A. SIPOC
B. Multi-Vari
C. Box PlotD
View answer
Correct Answer: B
Question #2
The use of Kanbans work best with pull systems for determining the timing of which products or services are produced.
A. True
B. False
View answer
Correct Answer: A
Question #3
The generation of a Regression Equation is justified when we _____________. (Note: There are 4 correct answers).
A. Expect the relationship to be Linear between the output and inputs
B. Know that there is a non-linear relationship between output and input(s)
C. Need to understand how to control a process output by controlling the input(s)
D. Experience several process defects and have no other way to fix hem
E. When it is very expensive or too late to measure the output
View answer
Correct Answer: AC
Question #4
The use of station warning lights, tool boards and jidohka devices in the application of Lean accomplish which of these principles?
A. Pilferage Minimization
B. Visual Factory
C. Management Awareness
D. Operator Attentiveness
View answer
Correct Answer: B
Question #5
Which statement(s) are correct for the Regression Analysis shown here? (Note: There are 2 correct answers).
A. This Regression is an example of a Multiple Linear Regression
B. This Regression is an example of Cubic Regression
C. %Cu explains the majority of the process variance in heat flux
D. Thickness explains over 80% of the process variance in heat flux
E. The number of Residuals in this Regression Analysis is 26
View answer
Correct Answer: AD
Question #6
According to the definition of Rolled Throughput Yield which of the following items best describe the purpose of RTY?
A. A function of Y=f(x)
B. Determines incremental Growth
C. Isolates the increase throughput
D. Accounts for rejects and reworks
View answer
Correct Answer: D
Question #7
If a process has Outliers which pair of charts is most preferable if subgroups will exist for the Continuous Data?
A. Individual—Moving Range
B. Xbar-R Charts
C. Xbar-S Charts
D. nP and P Charts
View answer
Correct Answer: B
Question #8
Select all the statements that are true after reviewing the Capability Analysis shown here. (Note: There are 4 correct answers).
A. The process is out of Control
B. The process is properly assumed to be a Normal process
C. The Mean of the process moving range is 1
D. This Capability Analysis used subgroups
E. Majority of the dimensional values are outside of the tolerance than within
View answer
Correct Answer: BC
Question #9
When it comes to Control one of the most effective means of eliminating defects is to _________________ .
A. Train personnel often and thoroughly
B. Keep a Six Sigma project going on the process at all times
C. Design defect prevention into the product
D. Have each process consist of no more than five steps
View answer
Correct Answer: C
Question #10
SPC on the outputs is more preferred than SPC on the inputs when implementing SPC for your process.
A. True
B. False
View answer
Correct Answer: B
Question #11
When a Belt applies the practice of Poka-Yoke to a project challenge she is attempting to make certain the activity is _______________ .
A. Well documented
B. Removed from the line
C. Mistake proofed
D. Highly visible
View answer
Correct Answer: C
Question #12
When analyzing a data set we frequently graph one metric as a function of another. If the slope of the Correlation line is -2.5 we would say the two metrics are ___________ correlated?
A. Positively
B. Not
C. Negatively
D. None
View answer
Correct Answer: C
Question #13
The Lean Principle action in the 5S approach that deals with having those items needed regularly at hand and those items need less regularly stored out of the way is known as ___________.
A. Shining
B. Standardizing
C. Sustaining
D. Sorting
View answer
Correct Answer: D
Question #14
The following Business Case is constructed properly. “During fiscal year 2008 the warranty returns for electric razor Model 312 were 1.3%. This represents a gap of 0.5% over target costing the company $18,500 per month.”
A. True
B. False
View answer
Correct Answer: A
Question #15
A Belt will occasionally do a quick experiment referred to as an OFAT which stands for ____________________.
A. Only a Few Are Tested
B. Opposite Factors Affect Technique
C. One Factor At a Time
D. Ordinary Fractional Approach Technique
View answer
Correct Answer: C
Question #16
A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?
A. Never, a Control Plan is a living document
B. As soon as the Champion signs off
C. Within 30 days of the LSS project review team meeting
D. After the project has been presented at the recognition event
View answer
Correct Answer: A
Question #17
Which statement(s) are true about the Fitted Line Plot shown here? (Note: There are 2 correct answers).
A. When Reactant increases, the Energy Consumed increases
B. The slope of the equation is a positive 130
C. The predicted output Y is close to -18 when the Reactant level is set to 6
D. Over 85 % of the variation of the Energy Consumed is explained by the Reactant via this Linear Regression
View answer
Correct Answer: CD
Question #18
Fractional Factorial designs for an experimental approach are used when ____________ about the multiple metric interaction in a process.
A. Much is known
B. Little is known
C. We don’t care
D. Data exists
View answer
Correct Answer: B
Question #19
As part of a Visual Factory plan __________ cards are created and utilized to identify areas in need of cleaning and organization.
A. Kanban
B. Kaizen
C. Poke-Yoke
D. WhoSai
View answer
Correct Answer: A
Question #20
Bias in Sampling is an error due to lack of independence among random samples or due to systematic sampling procedures.
A. True
B. False
View answer
Correct Answer: A
Question #21
After reviewing the Capability Analysis shown here select the statement(s) that are untrue.
A. The process is properly assumed to be a Normal process
B. The Mean of the process moving range is 1
C. The process is out of Control
D. This Capability Analysis used subgroups
E. Majority of the dimensional values are outside of the tolerance than within
View answer
Correct Answer: A
Question #22
The actual experimental response data varied somewhat from what a Belt had predicted them to be. This is the result of which of these?
A. Inefficiency of estimates
B. Residuals
C. Confounded data
D. Gap Analysis
View answer
Correct Answer: B

View Answers after Submission

Please submit your email and WhatsApp to get the answers of questions.

Note: Please make sure your email ID and Whatsapp are valid so that you can get the correct exam results.

Email:
Whatsapp/phone number: