SPOTO's latest exam dumps on the homepage, with a 100% pass rate! SPOTO delivers authentic Cisco CCNA, CCNP study materials, CCIE Lab solutions, PMP, CISA, CISM, AWS, and Palo Alto exam dumps. Our comprehensive study materials are meticulously aligned with the latest exam objectives. With a proven track record, we have enabled thousands of candidates worldwide to pass their IT certifications on their first attempt. Over the past 20+ years, SPOTO has successfully placed numerous IT professionals in Fortune 500 companies.

Take other online exams

Question #1
Case Study: 1 Scenario A computerized system is being created to monitor the life support system on board a submarine. It monitors air quality, water supplies and temperature. This system will be supplied and maintained by SubsInc. SubsInc uses the V-model for software development and conducts four levels of testing, from unit through to operational and site acceptance testing. Two key risks identified for the air quality system are: If the percentage of oxygen in the air falls too low, personnel may suffoc
A. The system required to monitor oxygen levels may be more expensive than those required to monitor air temperatures
B. SubsInc may need to recruit extra developers and testers to deliver the project on time
C. Oxygen levels may reach dangerously low levels
D. Extreme temperatures may lead to heat exhaustion of personnel
View answer
Correct Answer: C
Question #2
When creating the functional specification for the temperature control system, which of the following review types would be most recommended to resolve any issues?
A. A walkthrough
B. A technical review
C. A management review
D. A code inspection
View answer
Correct Answer: B
Question #3
Which of the following would be an entry criterion into site acceptance testing for the air quality monitoring system?
A. That the code written to fulfil the requirement to monitor carbon dioxide levels has been 100% path tested
B. That the functional specification accurately reflects requirements R1 and R2
C. That the system has been tested at levels of oxygen usage well beyond anticipated personnel levels
D. That the requirements for temperature control have been signed-off
View answer
Correct Answer: C
Question #4
Which of the following is an accurate depiction of the hierarchy of test management documentation (where the highest comes first)?
A. Test policy-Test strategy-Project test plan-System test plancorrect
B. Test strategy-Test policy-Project test plan-System test plan
C. Test policy-Project test plan-Test strategy-System test plan
D. Project test plan-Test strategy-System test plan-Test policy
View answer
Correct Answer: A
Question #5
Which of the following test design techniques would be most suitable for testing that the oxygen is released at the required times?
A. Decision Testing
B. Statement Testing
C. Data flow Testing
D. Boundary Value Analysis
View answer
Correct Answer: D

View The Updated Other Exam Questions

SPOTO Provides 100% Real Other Exam Questions for You to Pass Your Other Exam!

View Answers after Submission