DON'T WANT TO MISS A THING?

Certification Exam Passing Tips

Latest exam news and discount info

Curated and up-to-date by our experts

Yes, send me the newsletter

Free HP HPE7-A03 Practice Questions & Answers 2026 Part2 | Aruba Certified

Are you preparing for the Aruba HPE7-A03 certification exam? SPOTO offers the Aruba HPE7-A03 Premium File; all questions are aligned with the latest exam content and come with expert-provided answers. Our question banks cover the latest question types, core concepts, and detailed explanations, helping you familiarize yourself with the exam format and difficulty level. Whether you are reviewing core concepts or simulating a real exam environment, these resources will rapidly boost your confidence and readiness.
For over two decades, SPOTO has successfully helped numerous IT professionals secure their ideal positions at Fortune 500 companies. Download now to start practicing efficiently and ensure a high score on the actual exam. Don't miss this opportunity to pass your certification exam with ease!
Take other online exams

Question #1
A global furniture retail company called 'No-Stair Inc.' requests you design their new WLANinfrastructure for a global footprint. Each location of No-Stair Inc.' has a similar layout: three smallmanager offices, a warehouse, and a 'retail' area. The 'retail' area and the warehouse together amount to 95% of the location. The IT department ofthe company Is minimally engaged In their LAN refresh so the CTO of the company has shared theinformation belowCurrent WLAN Infrastructure Is based on the 802.1 In "WlF14Less" access-points series (both model2013-INT (2.4 only Internal antenna) and model 2019-EXT (dual-band external antenna only)). TheseAP models are standalone without any centralized management. Last year 'No-Stair InC ran a projectcalled secure. It' ensuring that all needed network security was Implemented to be fully compliantwith their security standards. During this project, they also upgraded the AAA infrastructure tohandle the Increased AAA requests. No additional Wi-Fi or security requirements are listed for thisWLAN refresh, which means that 'No-Stair Inc.' will continue to use bridged SSIDs. with localbreakout into different VLANs.The CTO of No-Stair Inc.' understands the need for you to ask additional questions to deliver thedesign The questions may be sent in written form and will be answered within two weeks.Which additional question is correct in order to collect needed information for the WLAN design?
A. ho is the campus switch vendor?
B. s there a current RF survey report that you can share?
C. hat type of fiber connection Is used between the core and access layer switches?
D. S there enough cooling In the MDF?
View answer
Correct Answer: B
Question #2
A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use.The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location- based services The client decided that they would like to manage two wiring closets as a single stack with a total of 10 switches and a minimum transport speed or ?5Gbps over 0M4 MM Tiber They would also like to keep the stacking cabling cost to a minimum.Which switch series would most economically accomplish these requirements?
A. ruba 6300F Switch Series
B. ruba 6400 Switch Series
C. ruba 6100 Switch Series
D. ruba 6200F Switch Series
View answer
Correct Answer: A
Question #3
Which member types require a reboot when doing an In-Service-Software-Upgrade within a VSF stack?
A. Standby
B. Conductor
C. Member
D. all member types
E. Reveal Answer
View answer
Correct Answer: A
Question #4
A global cruise line company needs to refresh its current fleet. They win refresh the insides' of the ship to be cost-effective and increase their sustain ability. They Mill replace the complete WLAN/LAN hardware of the ship. In this refresh, the company will not refresh Us current security requirements. The CIO also wants to limit the number of unused ports in the switches. Future expansion will always mean a refresh of hardware. They start with the smallest ship with a maximum of 800 guestsEach ship has a LAN infrastructure consisting of two core switches, up to 10 redundant distribution switches, and up to 500 access switches (400 cabins. 100 technical rooms). The Core switches are located in the MDF of the ship and the distribution switches are located in the IDFs of the ship. Each cabin and technical room gets one single access switch.The cabling structure of the ship will not be refreshed. Each IDF is connected to the MDF by SMF. of which two pairs are available for the interconnect between the core and distribution. The length of SM fiber between MDF and IDF is less than 300 meters (930 ft) and the type used is 0S1. Each cabin is connected by a single 0M2 pair to the IDF. the maximum length is 60 meters (200 ft). Each technical room is connected by a single 0M2 pail to the IDF. with lengths between 100 and 150 meters (320 and 500 ft).For each cabin/technical room the customer is looking to replace their current fan-less 2530/2540 without changing the requirements, except they need to upgrade the uplink to distribution switch to 10GbEto handle the increased network traffic, and the technical rooms need redundant power.The WLAN infrastructure will be 1:1 refreshed without new cabling or new AP locations. Their WLAN Infrastructure is based on the 200/300 series Indoor and outdoor APs running instantOS (less than 300 APs). the customer has no change in WLAN requirements.The cruise line company will replace its current Internet connection before the LAN/WLAN refresh. The new Internet connection will provide a 99.8% uptime, which is needed to ensure the paid guest Wi-Fi is always operational. With this new internet connection, the CIO of the cruise line wants to base the design on the ESP architecture from Aruba because Internet connection is guaranteed.Based on the best practices, what should be recommended as the most cost-effective switch model tor the technical rooms?
A. HPE Aruba Networking 6300M 24p HPE Smart Rate 1 G/2
B. HPE Aruba Networking 6200M 36G 12SR5 ClassG PoE 4SFP*
C. HPE Aruba Networking 6200M 24G Class- PoE 4SFP*
D. Aruba 6300M 12p Classd PoE and 36p Class6 PoE HPE Smart Rate 1G/2
View answer
Correct Answer: A
Question #5
A customer wants to have the ability to show network usage. Which product would allow them to have this visibility?
A. Central
B. ClearPass
C. UXI
D. Aruba OS 8
View answer
Correct Answer: A
Question #6
A customer wants to have the ability to show network usage. Which product would allow them to have this visibility?
A. Central
B. ClearPass
C. UXI
D. Aruba OS 8
View answer
Correct Answer: A
Question #7
The customer recently found out that Aruba OS-CX switches are capable of Application Recognition. What requirements should be fulfilled in order to do this? (Select two.)
A. 6400 with Aruba CX Advanced License
B. 6300F/M with Aruba CX Advanced License
C. 8360 with Aruba CX Advanced License
D. 6200F/M with Aruba CX Advanced License
View answer
Correct Answer: A
Question #8
identify the stakeholders when gathering information for the network design and new IDF/MDF design. (Select two.)
A. Help desk manager
B. Facility manager
C. Chief Financial Officer
D. Network Operations manager
E. Reveal Answer
View answer
Correct Answer: AD
Question #9
A large multinational financial institution has contracted you to design a new full-stack wired andwireless network for their new 6-story regional office building. The bottom two floors of this facilitywill be retail space for a large banking branch. The upper floors will be carpeted office space forcorporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off siteand will be out of scope for this project. The customer is underserved by its existing L2-basednetwork infrastructure and would like to take advantage of modern best practices in the new design.The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets forcustomer service, and there will be a mix of wired and wireless devices throughout the retail floors.The corporate users will primarily use wireless for connectivity, but several wired clients, printers,and hard VoIP phones will be in use.The customer is also planning on renovating the corporate office space in order to take advantage of"smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics,and other location-based servicesThe client has decided to market additional tools to its retail customers. The desire is to make a BlueDot wayfinding. app available to any customer to allow them to locate stores and services within theretail space. They would also like to have directed pop-ups within the app appear when a customerwalks within close proximity to any of the 10 "Promotional Kiosks"What licensing will be needed to make this retail solution a reality? (Select two.)
A. ty 1 Meridian Map subscription
B. ty Z Meridian Blue Dot subscriptions
C. ty 2 Meridian Map subscriptions
D. ty 10 Aruba beacons
View answer
Correct Answer: AD
Question #10
What is one use case for designing a 2-tier campus LAM instead of using a 3-tier?
A. he campus has small buildings with only a few wiring closets
B. he network has grown beyond a few building aggregation points
C. ccess aggregation points are not scaling to meet traffic demands
D. ross-campus traffic has grown beyond We capacity of a single collapsed core
View answer
Correct Answer: A
Question #11
You are delivering a replacement collapsed core network proposal to the customer where the core switches will have the switched virtual interlaces (SVl) configured. The customer is not sure that a USX pair of switches will Be able to act as I tie spanning tree root in their environment.
A. The primary vsx switch ts the spanning tree root and the default behavior is the links on the secondary vsx switch are blocked with sub-millisecond failover assured by vsx active-gateway
B. When LAG interfaces are configured on a VSX pair of switches, both switches are "operational primary" and ensure active-active LAG operation equally
C. Both VSX switches are configured with the system MAC and then create unique STP bridge-IDs to identify "operational primary" and "operational secondary" for proper STP functioning
D. Aruba VSX switches support either multiple spanning tree (MSTP) or rapid per VLAN spanning tree (RPVST)
E. The ISL between VSX switches is never part of STP domain and doesn't send or receive BPDUs on this link and this ensures the "operational primary" and "operational secondary" switches are deterministic to other dual-attached switches
View answer
Correct Answer: DE
Question #12
ACME retail has 38 locations spread out across Ave US states and two provinces in Canada. They are looking to grow 20% over the next two years. They have an HO with a staff of 200 employees. The organization has eight Regional Managers and two VPs who work from home and the road. Stores typically have 17 employees on average per location.The two warehouses have a remote loading system and 20 employees each to load the trucks and fulfill the online orders. The warehouse has 40-foot ceilings and large metal racks to store inventory. The main location is 240K sq ft (22300 st) m) and the Canadian warehouse Is 130K sq ft (12100 sq ml. The forkllfts on the loading docks are equipped with a wireless tablet on board.A typical store Is reportedly about 60.000 sq ft (5575 sqm) and smaller stores are planned at 25.000 sq ft'2320 sq mi. The locations need to expand the abilities to vendors that need to add setup displays or Interactive kiosks in the stores. The current Infrastructure was installed In 2015 and used wireless N technology in a coverage model. The wiring is CatS. and they are unsure of the fiber connections. The inventory is all placed on the floor when it is delivered to the local store.Inventory control is handled through Zebra barcode scanners, and they have had a lot of issues in getting signals throughout the stores and this makes monthly inventory difficult. The organization has a small help desk to troubleshoot issues that happen at the retail locations and PC support for the office. The company is looking to upgrade away from the current pbx system later this year. With the need to grow and cut costs, they are interested in moving the data to the cloud but need to get almost real-time inventory control for the online service to function.The network has all been wired over the last ten years, but with the new systems being all wireless, they have seen the trend to offer wireless to all the vendors for their needs but also would like to allow employees, guests, and contractors all to use it. With the new IT director starting next week, the project has been set by the CTO of the company. The marketing group has asked how they can interact with the customers and get more info, while the IT support desk needs to cut staff in halt.The. office has an MDF and two IDFs located on floors one and two. The HOF is in the basement, and you have multiple WAN circuits for the HO links. Each store has a local handoff from the cable company (ethernet) In the middle of the store in the office, so distance for the wiring is not an issue.The customer has budget concerns but does want something that could last 7+ years.The IT staff at ACME retail is asking for recommendations to support Aruba deployment-Based on the limited information provided, what training should you recommend?
A. PE Aruba Networking Education Services training credits
B. atasheets
C. irheads community
D. ouTube
E. irwave class
View answer
Correct Answer: A
Question #13
which documentation resources con be used for finding validated information on Aruba products that assist the architect in building the solution design? (Select three.)
A. product reviews (CNET, Network World)
B. configuration guides
C. datasheets
D. Gartner annual reports
E. competitive documentation
F. validated Solution Guide
G. Reveal Answer
View answer
Correct Answer: BCF
Question #14
A global cruise line company needs to refresh its current fleet. They win refresh the insides' of the ship to be cost-effective and increase their sustain ability. They Mill replace the complete WLAN/LAN hardware of the ship. In this refresh, the company will not refresh Us current security requirements. The CIO also wants to limit the number of unused ports in the switches. Future expansion will always mean a refresh of hardware. They start with the smallest ship with a maximum of 800 guestsEach ship has a LAN infrastructure consisting of two core switches, up to 10 redundant distribution switches, and up to 500 access switches (400 cabins. 100 technical rooms). The Core switches are located in the MDF of the ship and the distribution switches are located in the IDFs of the ship. Each cabin and technical room gets one single access switch.The cabling structure of the ship will not be refreshed. Each IDF is connected to the MDF by SMF. of which two pairs are available for the interconnect between the core and distribution. The length of SM fiber between MDF and IDF is less than 300 meters (930 ft) and the type used is 0S1. Each cabin is connected by a single 0M2 pair to the IDF. the maximum length is 60 meters (200 ft). Each technical room is connected by a single 0M2 pail to the IDF. with lengths between 100 and 150 meters (320 and 500 ft).For each cabin/technical room the customer is looking to replace their current fan-less 2530/2540 without changing the requirements, except they need to upgrade the uplink to distribution switch to 10GbEto handle the increased network traffic, and the technical rooms need redundant power.The WLAN infrastructure will be 1:1 refreshed without new cabling or new AP locations. Their WLAN Infrastructure is based on the 200/300 series Indoor and outdoor APs running instantOS (less than 300 APs). the customer has no change in WLAN requirements.The cruise line company will replace its current Internet connection before the LAN/WLAN refresh. The new Internet connection will provide a 99.8% uptime, which is needed to ensure the paid guest Wi-Fi is always operational. With this new internet connection, the CIO of the cruise line wants to base the design on the ESP architecture from Aruba because Internet connection is guaranteed.Based on the best practices, what should you recommend as the correct optic type for the connection between the IDF and the cabins?
A. Aruba 106 SFP- LC LRM 220 m MMF Transceiver
B. Aruba 10GBASE-T SFP- RJ--35 30 m Cat6A Transceiver
C. Aruba 106 SFP- LC SR 300 m MMF Transceiver
D. Aruba 10G LC BiDi 40 km-D 1330/1270 XCVR
View answer
Correct Answer: C
Question #15
A large multinational financial institution has contracted you to design a new full-stack wired andwireless network for their new 6-story regional office building. The bottom two floors of this facilitywill be retail space for a large banking branch. The upper floors will be carpeted office space forcorporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off siteand will be out of scope for this project. The customer is underserved by its existing L2-basednetwork infrastructure and would like to take advantage of modern best practices in the new design.The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets forcustomer service, and there will be a mix of wired and wireless devices throughout the retail floors.The corporate users will primarily use wireless for connectivity, but several wired clients, printers,and hard VoIP phones will be in use.The customer is also planning on renovating the corporate office space in order to take advantage of"smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics,and other location-based servicesThe client decides that they would like for all of their exposed printer, conference room, and VoIPphoneconnections to be controlled by a stateful firewallWhat could be planned to ensure that these ports will meet the customer's requirements?
A. unneled Node
B. ulti-Zone
C. irgroup
D. eb Portal
View answer
Correct Answer: A
Question #16
What is the simple difference between a main distribution framework (MOF) closet and an intermediate distribution framework (IDF) closet?
A. DFs only connect to other MDFs
B. DFs always have larger rooms than IDFs
C. OF is the point where traffic egresses the campus network, and IDFs distribute that connectivity throughout the building
D. DF Is a term used in Europe whereas the Americas refer to all network closets as IDFs in their documentation
View answer
Correct Answer: C
Question #17
Which is true when it comes to Aruba Central licensing for gateways? (Select two.)
A. Aruba Gateway normal licensing is subdivided into three categories: Foundation
B. SD-WAN Gateway functionality requires security licensing
C. Aruba SD-8ranch Gateway licenses allow normal WLAN Gateway features within a campus
D. Aruba WLAN Gateway licenses allow normal SD-Branch features within a campus
E. Reveal Answer
View answer
Correct Answer: BC
Question #18
A customer wants to have the ability to show network usage. Which product would allow them to have this visibility?
A. AUXI
B. BHPE Aruba Networking Central
C. CArubaOS 8
D. DHPE Aruba Networking ClearPass
View answer
Correct Answer: B
Question #19
'Don't Buy at Us' is a US-based retail company that is expanding Into Europe. They are expanding into EMEA with a regional headquarters called HQ2 inside The Netherlands.
A. core: 2 x 8360-12C in VSX (ISL 2x100GbE DAC) aggregation: 2 x Aggregation stacks, each consists of 2 Aruba 8360-16Y2C in VSX (ISL 2x100GbE DAC, 2 x 25GbE uplinks per stack) access stack: 17 x stack of Aruba 6300F 48-port 1GbE Class 4 PoE and 4-port SFP56 (each stack has 4 members, VSF with 50GbE VSF links, 2 x 25GbE uplinks per stack)
B. core: 2 x 8360-12C in VSX (ISL 2x100GbE DAC) aggregation: 2 x aggregation stacks, each consists of 2 Aruba 8360-16Y2C in VSX (ISL 2x100GbE DAC, 2 x 100GbE uplinks per stack) access stack: 17 x stack of Aruba 6300F 48-port 1GbE Class 4 PoE and 4-port SFP56 (each stack has 4 members, VSF with 50GbE VSF links, 2 x 25GbE uplinks per stack)
C. core: 2 x 8360-12C in VSX (ISL 2x100GbE DAC) aggregation: 2 x aggregation stacks, each consists of 2 Aruba 8360-32Y4C in VSX (ISL 2x100GbE DAC, 2 x 100GbE uplinks per stack) access stack: 17 x stack of Aruba 6300F 48-port 1GbE Class 4 PoE and 4-port SFP56 (each stack has 4 members, VSF with 50GbE VSF links, 2 x 25GbE uplinks per stack)
D. collapsed core: 2 x 8360-16Y2C in VSX (ISL 2x100GbE DAC) access switch: 17 x stack of Aruba 6200F 48G Class4 PoE 4SFP+ 740W (each stack has 4 members, VSF with 10GbE VSF links, 2 x 10GbE uplinks per stack)
View answer
Correct Answer: C
Question #20
A global cruise line company needs to refresh its current fleet. They will refresh the 'insides' of the ship to be cost-effective and increase their sustainability. They will replace the complete WLAN/LAN hardware of the ship. In this refresh, the company will not refresh its current security requirements. The CIO also wants to limit the number of unused ports in the switches. Future expansion will always mean a refresh of hardware. They start with the smallest ship with a maximum of 800 guests. Each ship has a LAN infrastructure consisting of two core switches, up to 10 redundant distribution switches, and up to 500 access switches (400 cabins, 100 technical rooms). The core switches are located in the MDF of the ship and the distribution switches are located in the IDFs of the ship. Each cabin and technical room gets one single access switch. The cabling structure of the ship will not be refreshed. Each IDF is connected to the MDF by SMF, of which two pairs are available for the interconnect between the core and distribution. The length of SM fiber between MDF and IDF is less than 300 meters (980 ft) and the type used is OS1. Each cabin is connected by a single OM2 pair to the IDF, the maximum length is 60 meters (200 ft). Each technical room is connected by a single OM2 pair to the IDF, with lengths between 100 and 150 meters (320 and 500 ft). For each cabin/technical room the customer is looking to replace their current fan-less 2530/2540 without changing the requirements, except they need to upgrade the uplink to distribution switch to 10 GbE to handle the increased network traffic, and the technical rooms need redundant power. The WLAN infrastructure will be 1:1 refreshed without new cabling or new AP locations. Their WLAN infrastructure is based on the 200/300 series indoor and outdoor APs running InstantOS (less than 300 APs), the customer has no change in WLAN requirements. The cruise line company will replace its current Internet connection before the LAN/WLAN refresh. The new Internet connection will provide a 99.8% uptime, which is needed to ensure the paid guest Wi-Fi is always operational. With this new Internet connection, the CIO of the cruise line wants to base the design on the ESP architecture from Aruba because the Internet connection is guaranteed. Based on best practices, what should you recommend as the correct optic type for the connection between the IDF and the cabins? Comprehensive and Detailed Explanation From Exact Extract: Cabling Type in Use: Each cabin and technical room is connected to the IDF with a single OM2 multimode fiber pair. The maximum length to cabins is 60 meters, and to technical rooms 100--150 meters. Best Practice for 10 GbE over OM2: According to Aruba's Campus Access Design Guides and HPE Aruba CX switch transceiver support matrices: OM2 multimode fiber supports 10GBASE-SR optics up to 82 meters. Since the maximum run is 60 meters, 10GBASE-SR is fully supported with headroom. 10GBASE-LRM can reach 220 m on MMF, but is not required here because the fiber length is much shorter. SR optics are simpler, lower cost, and recommended in best practices when distances are within OM2 limits. 10GBASE-T RJ-45 (Cat6A) is not applicable, as the cabling is fiber, not copper. BiDi 40 km optics are for long-haul single-mode fiber links, not short multimode fiber runs. Aruba Validated Design Reference: Aruba's Validated Solution Guides for Campus Access state that for short multimode connections (OM2/OM3/OM4), the recommended transceiver type is 10GBASE-SR (SFP+ LC) as it provides the most cost-effective and reliable option within the supported reach. Requirement Mapping: Uplinks to access switches in cabins/technical rooms must be 10 GbE capable. The OM2 cabling length (60--150 m) is within the supported distance for 10GBASE-SR. Therefore, the correct and most efficient optic choice is 10G SFP+ LC SR 300 m MMF Transceiver. Final Justification: Option B is correct because 10GBASE-SR over OM2 supports the required distances, aligns with Aruba design best practices, and avoids unnecessary cost/complexity of LRM or BiDi optics. Reference Extracts (Aruba Official Study & Design Guides): Aruba Campus Access Design Guide: recommended transceiver selection for MMF cabling. Aruba CX Transceiver Guide: 10GBASE-SR supports OM2 up to 82 m, OM3 up to 300 m, OM4 up to 400 m.
A. 10G SFP+ LC LRM 220 m MMF Transceiver
B. 10G SFP+ LC SR 300 m MMF Transceiver
C. 10GBASE-T SFP+ RJ-45 30 m Cat6A Transceiver
D. 10G LC BiDi 40 km 1330/1270 XCVR
View answer
Correct Answer: B
Question #21
A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use.The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based servicesThe client decided that they would like to manage two wiring closets as a single stack with a total of 10 switches and a minimum transport speed or 25Gbps over OM4 MM fiber They would also like to keep the stacking cabling cost to a minimum.Which stacking components would be required to meet the customer's requirements in the most cost-effective way if the closets were 190 m (620 ft) apart? (Select two.)
A. 50GDAC cables
B. SFP56 transceivers
C. 25GDAC cables
D. SFP28 transceivers
View answer
Correct Answer: BD
Question #22
A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use.The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based servicesThe client would like 10 include Blue Dot wayfinding for their carpeted office space. The retail floors are not currently in scopeWhat would be needed to ensure proper licensing of the solution?
A. Qty 4 Meridian Blue Dot subscriptions
B. Qtyl Meridian Tracking subscription Qty 1 Meridian Blue Dot subscription
C. Qty 4 Meridian Map subscriptions Qty 4 Meridian Blue Dot subscriptions
D. Qty 1 Meridian Blue Dot subscription
View answer
Correct Answer: D
Question #23
What is the simple difference between a main distribution framework (MOF) closet and an intermediate distribution framework (IDF) closet?
A. MOF is the point where traffic egresses the campus network, and IDFs distribute that connectivity throughout the building
B. MDFs always have larger rooms than IDFs
C. MDFs only connect to other MDFs
D. MDF Is a term used in Europe whereas the Americas refer to all network closets as IDFs in their documentation
E. Reveal Answer
View answer
Correct Answer: A
Question #24
What is the best practice for using VSX at the core of a 3-tier design?
A. SX-lags allow the collapsed core to connect directly to services such as gateways and services only so long as spanning tree is used to prevent loops
B. ou should never implement VSX at the core of a 3-tier redundancy core
C. ou should Implement VSX at the core when the aggregation layer operates at layer 2 only
D. ou should implement VSX at the core when the aggregation layer is layer 3 only with OSPF-routed traffic forwarding Between the core and aggregation layers
View answer
Correct Answer: C
Question #25
Which documentation resources con be used for finding validated information on Aruba products that assist the architect in building the solution design? (Select three.)
A. product reviews (CNET,Network World)
B. configuration guides
C. datasheets
D. Gartner annual reports
E. competitive documentation
F. validated Solution Guide
View answer
Correct Answer: BCF
Question #26
A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use.The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based servicesThe client would like 10 include Blue Dot location tracking in their four floors of corporate space. The APs are not Ideally placed to allow for smooth map transitions.What could you add lo provide better tracking? (Select two.)
A. UXI sensors
B. beacons
C. more APs
D. tags
View answer
Correct Answer: BC
Question #27
Which is true with regard to device capabilities?
A. AWi-Fi 6E supports 6 GHz for both indoor and outdoor deployments since it was ratified in April of 2020
B. BAruba recommends ao-50 devices per radio for a generic office deployment
C. CYou should determine If devices support 2 A GHz or 5 GHz
D. DAruba's best practice is to use whatever the AP model supports as a maximum
View answer
Correct Answer: B
Question #28
A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets forcustomer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use.The customer is also planning on renovating the corporate office space in order to take advantage of "smart office' technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based servicesThe client would like 10 include Blue Dot location tracking in their four floors of corporate space. The APs are not Ideally placed to allow for smooth map transitions.What could you add lo provide better tracking? (Select two.)
A. UXI sensors
B. beacons
C. more APs
D. tags
E. Reveal Answer
View answer
Correct Answer: BC
Question #29
The customer recently found out that Aruba OS-CX switches are capable of Application Recognition. What requirements should be fulfilled in order to do this? (Select two.)
A. A6400 with Aruba CX Advanced License
B. B6300F/M with Aruba CX Advanced License
C. C8360 with Aruba CX Advanced License
D. D6200F/M with Aruba CX Advanced License
View answer
Correct Answer: A
Question #30
A global furniture retail company called 'No-Stair Inc.' requests you design their new WLANinfrastructure for a global footprint. Each location of No-Stair Inc.' has a similar layout: three smallmanager offices, a warehouse, and a 'retail' area. The 'retail' area and the warehouse together amount to 95% of the location. The IT department ofthe company Is minimally engaged In their LAN refresh so the CTO of the company has shared theinformation belowCurrent WLAN Infrastructure Is based on the 802.1 In "WlF14Less" access-points series (both model2013-INT (2.4 only Internal antenna) and model 2019-EXT (dual-band external antenna only)). TheseAP models are standalone without any centralized management. Last year 'No-Stair InC ran a projectcalled secure. It' ensuring that all needed network security was Implemented to be fully compliantwith their security standards. During this project, they also upgraded the AAA infrastructure tohandle the Increased AAA requests. No additional Wi-Fi or security requirements are listed for thisWLAN refresh, which means that 'No-Stair Inc.' will continue to use bridged SSIDs. with localbreakout into different VLANs.The CTO of No-Stair Inc.' understands the need for you to ask additional questions to deliver thedesign The questions may be sent in written form and will be answered within two weeks.What additional question needs to be answered in order to collect needed information for tie WLANdesign?
A. hat type or fiber connection it used between the core and access layer switches?
B. ho Is the campus switch vendor?
C. s there enough cooling in the MOF?
D. oes the existing wired network support enough drops for an upgraded Wi-Fi Network?
View answer
Correct Answer: D
Question #31
A global furniture retail company called 'No-Stair Inc.' requests you design their new WLAN infrastructure for a global footprint. Each location of No-Stair Inc.' has a similar layout: three small manager offices, a warehouse, and a 'retail' area. The 'retail' area and the warehouse together amount to 95% of the location. The IT department of the company Is minimally engaged In their LAN refresh so the CTO of the company has shared the information below
A. Who is the campus switch vendor?
B. Is there a current RF survey report that you can share?
C. What type of fiber connection Is used between the core and access layer switches?
D. IS there enough cooling In the MDF?
View answer
Correct Answer: B

View The Updated Aruba Exam Questions

SPOTO Provides 100% Real Aruba Exam Questions for You to Pass Your Aruba Exam!

View Answers after Submission

Please submit your email and WhatsApp to get the answers of questions.

Note: Please make sure your email ID and Whatsapp are valid so that you can get the correct exam results.

Email:
Whatsapp/phone number:
Contact Us