السؤال #1
Who would be responsible for maintaining the Configuration Item Records?
A. Project Manager
B. Project Support
C. Project Assurance
D. Team Manager
عرض الإجابة
اجابة صحيحة: A
السؤال #2
Which statement best explains the purpose of Tailor to suit the project environment?
A. Ensure project controls are based on project's scale, complexity, importance, capability and risk
B. To use a set of pre-defined templates for the size of project
C. To tailor the use of the principles to suit the project
D. To pick which PRINCE2 processes to apply and which to leave out
عرض الإجابة
اجابة صحيحة: D
السؤال #3
Which statement is TRUE with regard to technical stages?
A. Technical stages can only occur sequential
B. Technical stages define where management decisions are appropriate
C. Technical stages often overlap
D. Technical stages define the commitment of resources and authority to spend
عرض الإجابة
اجابة صحيحة: B
السؤال #4
Scenario A central government department, the Ministry of Food Hygiene (MFH), faces increasing pressure to cut costs, better manage suppliers’ performance and reduce the confusion caused by inadequate internal controls, outdated standards and outdated technology. External consultants were employed to conduct a feasibility study to identify options to address the problems, and the likely costs and benefits. The following options were considered: Do nothing. Re-engineer selected business functions. Outsource
A. The 10-year outsourcing contract, at current prices, will be worth £80m
B. Outsourcing would allow MFH to take advantage of the best services the outsourcing industry has to offer
C. The total expected savings over 10 years, at current prices, is £20m
D. The 10-year outsourcing contract will enable MFH to stabilize costs at agreed levels
E. The confirmed cost of the Outsourcing project is £2
عرض الإجابة
اجابة صحيحة: B
السؤال #5
Scenario: Techniques, processes and procedures 1. Any threat that may result in a loss of MFH data must be escalated immediately. Joint agreements 2. Work is to start at the beginning of week 2 (Stage 4). 3. The project will take two years to complete, at an estimated cost of £2.5m. Tolerances 4. None. Constraints 5. MFH staff must not be involved in any heavy lifting during the removal of existing IT equipment. 6. Installation work must take place during MFH normal working hours. 7. +£10,000 / -£25,000. Re
A. Replace entry 8 with 'Checkpoint Report every Monday by 10
B. Delete entry 9 because this level of detail is unnecessary
C. Move entry 10 to Problem handling and escalation because that section describes how issues are handled
D. Add 'Any risks identified to be added to the Risk Register' to Reporting arrangements
E. Delete entry 11 because the impact analysis should be provided when the issue is notified
عرض الإجابة
اجابة صحيحة: DE
السؤال #6
Who is responsible for appointing the Project Manager?
A. Corporate or Programme Management
B. The Project Board
C. The Executive
D. Project Assurance
عرض الإجابة
اجابة صحيحة: AE
السؤال #7
While preparing the Configuration Management Strategy, the Project Manager considered the options for change control. He decided to recommend a change budget of £250k, but was undecided on the Change Authority to recommend. Which option is an appropriate Change Authority for the Outsourcing project?
A. The selected service provider to approve and implement all changes
B. Senior User(s) and Project Assurance representatives, within the limits of therecommended change budget
C. The Director of Facilities and the Director of Information Technology to approve all changes
عرض الإجابة
اجابة صحيحة: AD
السؤال #8
Which of the following statements would NOT be included in the Project Product Description?
A. Purpose of the product
B. Composition
C. Project level tolerances
D. Quality criteria
عرض الإجابة
اجابة صحيحة: A
السؤال #9
HOTSPOT Scenario Additional Information During the initiation stage the Project Manager met with the Marketing Director to find out more about the requirements of the promotional calendar and recorded the following notes: There has been a reduction in the order numbers at the MNO Manufacturing due in part to the increased marketing activities of its competitors. 10% of customers have not re-ordered in this financial year and staff morale is poor. A number of skilled staff have left as a result and replaceme
A. Mastered
B. Not Mastered
عرض الإجابة
اجابة صحيحة: A
السؤال #10
Who is responsible for the initial creation of the Configuration Item records?
A. Project Manager
B. Team Manager
C. Project Assurance
D. Project Support
عرض الإجابة
اجابة صحيحة: A
السؤال #11
There are two time driven controls in PRINCE2, which are they?
A. Highlight and End Stage Reports
B. Highlight and Checkpoint Reports
C. Checkpoint and End Project Reports
D. Highlight and Lessons Reports
عرض الإجابة
اجابة صحيحة: A
السؤال #12
Which of the following principles uses Product Descriptions to provide clarity by defining each product's purpose, composition, derivation, format, quality criteria and quality method?
A. Tailor to suit the project environment
B. Focus on products
C. Manage by stages
D. Continued business justification
عرض الإجابة
اجابة صحيحة: B
السؤال #13
Scenario A photographer from Portraits Ltd, a professional photographic company, has taken on the role of Team Manager after taking some time to understand the requirements of the project. A contract for their services has been set up and is being monitored by the Purchasing Manager and a Work Package has been agreed. This contract specifies that the photographer must arrange a meeting with the Engineering Manager to establish a schedule for the photo sessions to minimize the impact on the Engineering staff
A. Project Support will maintain the Risk Register
B. The evaluated net effect of all risks will be updated at the end of each stage and included in the End Stage Report
C. The Change Authority will report monthly to the Project Manager on the status of the change budget
D. Risks that are likely to occur within the next two weeks should be recorded as imminent
E. A summary of risks will be maintained and included with the monthly Highlight Reports to the Project Board
عرض الإجابة
اجابة صحيحة: D

عرض الإجابات بعد التقديم

يرجى إرسال البريد الإلكتروني الخاص بك والواتس اب للحصول على إجابات الأسئلة.

ملحوظة: يرجى التأكد من صلاحية معرف البريد الإلكتروني وWhatsApp حتى تتمكن من الحصول على نتائج الاختبار الصحيحة.

بريد إلكتروني:
رقم الواتس اب/الهاتف: