السؤال #1
Identify the missing word(s) from the following sentence. A project is a [?] that is created for the purpose of delivering one or more business products according to an agreed Business Case
A. Series of initiatives
B. Temporary organization
C. Business as usual activity
D. Permanent team
عرض الإجابة
اجابة صحيحة: B
السؤال #2
Which product would define a product's quality tolerance?
A. Quality Register
B. Product Description
C. Stage Plan
D. Quality Management Strategy
عرض الإجابة
اجابة صحيحة: B
السؤال #3
What is a purpose of the Closing a Project process?
A. Provide a fixed point at which acceptance for the project product is confirmed
B. Enable the Project Board to review the success of the current stage
C. Assign work to be done and monitor such work
D. Enable the organization to understand the work that needs to be done to deliver the project's products
عرض الإجابة
اجابة صحيحة: A
السؤال #4
In which process would it be demonstrated that each product meets its quality criteria?
A. Closing a Project
B. Managing a Stage Boundary
C. Directing a Project
D. Managing Product Delivery
عرض الإجابة
اجابة صحيحة: D
السؤال #5
Which PRINCE2 role would design and appointment the project management team?
A. Project Manager
B. Executive
C. Senior User
D. Project Assurance
عرض الإجابة
اجابة صحيحة: B
السؤال #6
Who are allowed to raise an issue?
A. Only the Project Manager and Team Manager
B. Anyone with an interest in the project or its outcome
C. Only the Change Authority
D. Only members of the project management team
عرض الإجابة
اجابة صحيحة: B
السؤال #7
According to PRINCE2, which of the following are the 6 aspects of project performance to be managed?
A. Processes, themes, principles, tailoring, tolerance, roles
B. Time, cost, people, quality, progress, risk
C. Time, cost, quality, scope, tolerance, benefits
D. Time, cost, scope, quality, benefits, risk
عرض الإجابة
اجابة صحيحة: D
السؤال #8
Which product records any project outcomes perceived as negative by stakeholders?
A. usiness Case
B. roject Plan
C. ommunication Management Strategy
D. roject Product Description
عرض الإجابة
اجابة صحيحة: A
السؤال #9
What is the goal of the 'identify context' step as part of the risk management procedure?
A. Identify responses to risks identified in the Business Case
B. Gather information about the project environment and objectives
C. Gather information about risks for inclusion in Highlight Reports to the Project Board
D. Identify the threats and opportunities that may affect the project's objectives
عرض الإجابة
اجابة صحيحة: B
السؤال #10
Which process ensures that plans for achieving the expected benefits are managed and reviewed?
A. Closing a Project
B. Initiating a Project
C. Directing a Project
D. Starting up a Project
عرض الإجابة
اجابة صحيحة: C
السؤال #11
Which process ensures that plans for realizing the post-project benefits are managed and reviewed?
A. Closing a Project
B. Initiating a Project
C. Directing a Project
D. Starting up a Project
عرض الإجابة
اجابة صحيحة: C
السؤال #12
Which product identifies the source products from which a product is to be derived?
A. Product Breakdown Structure
B. Product checklist
C. Product Description
D. Project approach
عرض الإجابة
اجابة صحيحة: C
السؤال #13
Which of the following does PRINCE2 say are typical characteristics of a Project Board member?
A. Democratic, supportive, can make decisions
B. Hard working, experienced, forceful
C. Focused, steadfast, autocratic
D. Have authority, credibility, ability to delegate, available when required
عرض الإجابة
اجابة صحيحة: C
السؤال #14
When are Work Package tolerances agreed?
A. When accepting a Work Package
B. When approving a Stage Plan
C. When creating the Project Plan
D. When creating the Project Brief
عرض الإجابة
اجابة صحيحة: A
السؤال #15
Where would the mechanism for the control of and access to a risk budget be defined?
A. Risk Management Strategy
B. Risk Register
C. Risk profile
D. Risk management procedure
عرض الإجابة
اجابة صحيحة: A
السؤال #16
In which process may a premature close of the project be authorized?
A. Directing a Project
B. Controlling a Stage
C. Managing a Stage Boundary
D. Closing a Project
عرض الإجابة
اجابة صحيحة: A
السؤال #17
Which product would be at the centre of any impact assessment of risks, issues and changes?
A. Highlight Report
B. Business Case
C. Lessons Log
D. Communication Management Strategy
عرض الإجابة
اجابة صحيحة: B
السؤال #18
Which statement about the ‘embrace change’ target is CORRECT?
A. It re-establishes team dynamics when a new member joins the team
B. It trades user stories for those of a similar size
C. It results in the late delivery of the minimum viable product
D. It degrades the performance of the features that are delivered
عرض الإجابة
اجابة صحيحة: D
السؤال #19
A stakeholder wishing to make an observation about the project would do what?
A. Ask for it to be included in the Communication Management Strategy
B. Raise an issue
C. Make an entry in the Issue Register
D. Arrange a meeting with a Project Board member
عرض الإجابة
اجابة صحيحة: B
السؤال #20
Which is NOT a recommended response to a threat?
A. Avoid
B. Exploit
C. Share
D. Transfer
عرض الإجابة
اجابة صحيحة: B
السؤال #21
Which of the following is a quality review team role?
A. Project Assurance
B. Producer
C. Chair
D. Quality Assurance
عرض الإجابة
اجابة صحيحة: C
السؤال #22
Which of the following is a specific quality review team role?
A. User
B. Approver
C. Reviewer
D. Project Support
عرض الإجابة
اجابة صحيحة: C
السؤال #23
What is an objective of the quality review technique?
A. Determine whether a product has been created
B. Agree the quality method that will be applied to a product
C. Formulate ideas on how the product will be developed
D. Provide consultation with a range of key interested parties regarding a product's quality
عرض الإجابة
اجابة صحيحة: D
السؤال #24
Which of the following would be carried out during the Starting Up a Project process?
A. Establish the procedure for identifying and managing risks during the project
B. Create a detailed Business Case
C. Appoint individuals to carry out the work required in project initiation
D. Ensure that plans for realizing the post-project benefits are managed and reviewed
عرض الإجابة
اجابة صحيحة: C
السؤال #25
In PRINCE2, the information regarding the business justification for the project is normally documented in which management product?
A. Business Case
B. Benefits Review Plan
C. Project Product Description
D. Communication Management Strategy
عرض الإجابة
اجابة صحيحة: A
السؤال #26
Which plan is optional depending on the complexity of the project?
A. Project Plan
B. Exception Plan
C. Team Plan
D. Initiation Stage Plan
عرض الإجابة
اجابة صحيحة: C
السؤال #27
Identify the missing words from the following sentence... For a project to start and carry on, a PRINCE2 principle states that a project must have [?]?
A. Lesson applied throughout
B. Continued business justification
C. At least two stages
D. Focus on products that will meet business expectations
عرض الإجابة
اجابة صحيحة: B
السؤال #28
Which project management team role has a specific responsibility for advising on the selection of the development strategy, design and methods?
A. Project Manager
B. Quality Assurance
C. Team Manager
D. Project Assurance
عرض الإجابة
اجابة صحيحة: D
السؤال #29
Which PRINCE2 role has a specific responsibility for advising on the selection of the development strategy, design and methods?
A. Project Manager
B. Quality Assurance
C. Team Manager
D. Project Assurance
عرض الإجابة
اجابة صحيحة: D
السؤال #30
Are the following statements regarding the Starting Up a Project process true or false? 1. How the project will achieve the required quality will be established 2. How the corporate (or programme's) project management method will be tailored to suit the project will be defined
A. Only 1 is true
B. Only 2 is true
C. Both 1 and 2 are true
D. Both 1 and 2 are false
عرض الإجابة
اجابة صحيحة: D
السؤال #31
Which statement about the ‘accept that the customer doesn’t need everything’ target is correct?
A. It gives confidence on the progress of the project
B. It can result in the early delivery of a minimum viable product
C. It allows misunderstandings to be dealt with appropriately
D. It is achieved by managing the culture of the team carefully
عرض الإجابة
اجابة صحيحة: C
السؤال #32
Identify the missing word(s) in the following sentence... The development and maintenance of a credible [?] provides a baseline against which progress can be measured.
A. Product
B. Product Status Account
C. Business Case
D. Plan
عرض الإجابة
اجابة صحيحة: D
السؤال #33
Which of the following is a Project Board control?
A. Approving a deviation of benefits tolerance
B. Approve a Plan, with its relevant tolerances for the next management stage
C. Review Checkpoint Reports to monitor progress
D. Use of project registers and logs to review progress
عرض الإجابة
اجابة صحيحة: B
السؤال #34
Which is a purpose of the ‘managing product delivery’ process?
A. To plan the delivery of the products before committing to significant expenditure
B. To agree on what is required for accepting, executing and delivering project work
C. To establish and deliver the project communications to the wider organization
D. To delegate day-to-day management of the project to the project manager
عرض الإجابة
اجابة صحيحة: B
السؤال #35
What is a purpose of the Directing a Project process?
A. Enable the Project Board to be accountable for the project's success
B. Establish solid foundations for the project
C. Enable the Project Manager to be accountable for the project's success
D. Assign work to be done and monitor such work
عرض الإجابة
اجابة صحيحة: A
السؤال #36
Which of the following roles can the Project Manager also perform?1. Change Authority2. Project Assurance3. Project Support4. Team Manager
A. 1, 2, 3
B. 1, 2, 4
C. 1, 3, 4
D. 2, 3, 4
عرض الإجابة
اجابة صحيحة: C
السؤال #37
Identify the missing word(s) in the following sentence... Quality planning provides the definition of the required products with their associated [ ? ] as a foundation for Project Board agreement.
A. Customer's quality expectations
B. Quality test results
C. Quality criteria
D. Owners
عرض الإجابة
اجابة صحيحة: C
السؤال #38
Which is a responsibility of the Project Manager?
A. Delegating responsibility for changes to the Change Authority
B. Documenting the Communication Management Strategy
C. Approving stage tolerances
D. Approving the customer's quality expectations
عرض الإجابة
اجابة صحيحة: B
السؤال #39
To which role should a forecast breach of benefits tolerance be referred?
A. Project Manager
B. Executive
C. Senior Supplier
D. Corporate or programme management
عرض الإجابة
اجابة صحيحة: D
السؤال #40
What is a purpose of the Closing a Project process?
A. Provide a fixed point at which acceptance for the project product is confirmed
B. Enable the Project Board to review the success of the current stage
C. Assign work to be done and monitor such work
D. Enable the organization to understand the work that needs to be done to deliver the project's products
عرض الإجابة
اجابة صحيحة: A
السؤال #41
Which product would hold details of each product's current version and any important relationships between them?
A. Product Description
B. Highlight Report
C. Configuration Item Record
D. Work Package
عرض الإجابة
اجابة صحيحة: C
السؤال #42
Which should be used to document any uncompleted work that needs to be done, and any risks which need to be managed after the project has closed?
A. Follow-on action recommendations
B. Exception Report
C. Issue Register
D. Risk Register
عرض الإجابة
اجابة صحيحة: A
السؤال #43
Which is a purpose of a Project Product Description?
A. Form part of the Work Package for the project product
B. Provide the initial project budget to be refined in the Business Case
C. Document the project mandate and gain approval for the project from the Project Board
D. Define the quality required of the project's product
عرض الإجابة
اجابة صحيحة: D
السؤال #44
Which of the following are product-based planning tasks? 1. Write a Project Product Description.2. Identify activities and dependencies 3. Create a product breakdown structure.4. Create a product flow diagram
A. 1, 3, 4
B. 1, 2, 3
C. 2, 3, 4
D. 1, 2, 4
عرض الإجابة
اجابة صحيحة: A
السؤال #45
Which are the specific roles of the PRINCE2 quality review technique?
A. Presenter, Chair, Reviewer, Administrator
B. Chair, Project Manager, Project Support, User
C. Reviewer, Administrator, Project Assurance, Executive
D. Stakeholder, Team Manager, Project Support, Reviewer
عرض الإجابة
اجابة صحيحة: A
السؤال #46
Which process would ensure that there is continued business justification?
A. Directing a Project
B. Managing a Stage Boundary
C. Initiating a Project
D. Starting Up a Project
عرض الإجابة
اجابة صحيحة: A
السؤال #47
Which of the following is a concession?
A. When a product fails to meet its quality criteria
B. When an off-specification is raised by the Senior User
C. When an off-specification is accepted by the Project Board or Change Authority without immediate corrective action
D. When a known error is no longer a problem
عرض الإجابة
اجابة صحيحة: C
السؤال #48
Which product does the Project Board use as a base against which to monitor project progress on a stage by stage basis?
A. Stage Plan
B. Project Plan
C. Programme Plan
D. Benefits Review Plan
عرض الإجابة
اجابة صحيحة: B
السؤال #49
Which of the following statements describes a risk event?
A. The area of uncertainty in terms of the threat or the opportunity
B. The situation that gives rise to the risk
C. The impact(s) that the risk would have on the project objectives should the risk materialize
D. How soon in the future the risk is likely to occur
عرض الإجابة
اجابة صحيحة: A
السؤال #50
According to PRINCE2, which of the following is a benefit?
A. An improved business operation
B. The measurable improvement resulting from an outcome
C. The tangible or intangible product resulting from a planned activity
D. The result of change, normally affecting real-world behaviour and/or circumstances
عرض الإجابة
اجابة صحيحة: B
السؤال #51
When is the Risk Register created?
A. During the first End Stage Assessment
B. During the initiation stage
C. When preparing a Project Brief during pre-project work
D. When authorizing the project
عرض الإجابة
اجابة صحيحة: B
السؤال #52
Which is a purpose of the Organization theme?
A. Allocates jobs to people in the project
B. Defines different levels of plan for the different management levels
C. Define and establish the project's structure of accountability
D. Define and implement the means by which the project will create and verify products that are fit for purpose
عرض الإجابة
اجابة صحيحة: C
السؤال #53
According to PRINCE2, which of the following roles cannot be shared?
A. Project Assurance
B. Project Support
C. Executive
D. Team Manager
عرض الإجابة
اجابة صحيحة: C
السؤال #54
Identify the missing word in the following sentence... A PRINCE2 project focuses on the definition and delivery of, in particular their quality requirements?
A. Benefits
B. Products
C. Activities
D. Outcomes
عرض الإجابة
اجابة صحيحة: B
السؤال #55
Which task is performed by the Change Authority?
A. Set a change budget
B. Approve or reject a request for change within approved limits
C. Refer changes that exceed budgetary limits to the Project Manager for approval
D. Update the configuration management system whena change is approved
عرض الإجابة
اجابة صحيحة: B
السؤال #56
Which of the following would be defined within the Project Brief?
A. The Communication Management Strategy
B. The scope of the project
C. The initiation Stage Plan
D. The Lessons Report for the project
عرض الإجابة
اجابة صحيحة: B
السؤال #57
Please refer to section 12.2 in the PRINCE2 Manual. (The initiation Stage Plan is produced in the Starting up a Project process and is then used by the Project Board to authorize the initiation stage)
A. Immediately prior to the authority to deliver a project has been given
B. Before the Project Board authorize the initiation of the project
C. After the Project Plan has been produced
D. During Managing a Stage Boundary process
عرض الإجابة
اجابة صحيحة: B
السؤال #58
Which of the following describes risk proximity?
A. The timeframe over which the risk mitigation actions should be implemented
B. The schedule for the risk management activities related to a plan
C. The timeframe over which a risk will be monitored by the risk owner
D. The timeframe for when the risk might materialize
عرض الإجابة
اجابة صحيحة: D
السؤال #59
If any type of issue or risk (or aggregation of them) cannot be resolved within the tolerances set by the Project Board, which of the following products would first be sent to the Project Board to inform them of this deviation?
A. Exception Report
B. End Stage Report
C. Highlight Report
D. Updated Risk and Issue Registers
عرض الإجابة
اجابة صحيحة: A
السؤال #60
During project initiation, who determines the use of a Change Authority and whether a change budget will be used?
A. Project Board
B. Change Authority
C. Project Manager
D. Corporate or Programme Management
عرض الإجابة
اجابة صحيحة: B
السؤال #61
Which is one of the six aspects of project performance that needs to be managed?
A. Issues
B. People
C. Benefit
D. Tolerance
عرض الإجابة
اجابة صحيحة: C
السؤال #62
Which statement about the waterfall methodology definition is CORRECT?
A. It states that deadlines should not be moved
B. It has distinct goals for each stage of development
C. It is a behavior that involves making things transparent
D. It promotes the use of experiments carried out in a scientific way
عرض الإجابة
اجابة صحيحة: B
السؤال #63
Which statement about the ‘keep teams stable’ target is CORRECT?
A. It applies primarily to the long term, such as a project or a program
B. It is the primary reason why the tolerance for cost is set to zero
C. It prevents compromising the overall quality level of the product
D. It results in the early delivery of a minimum viable product
عرض الإجابة
اجابة صحيحة: B
السؤال #64
Which option describes something that should be provided by the project, but currently is not (or is forecast not to be) provided?
A. Problem/concern
B. Concession
C. Off-specification
D. Exception Report
عرض الإجابة
اجابة صحيحة: C
السؤال #65
Identify the missing word from the following sentence... PRINCE2 uses the term [ ? ] to cover any relevant event that has happened, was not planned, and requires management action?
A. Risk
B. Change
C. Issue
D. Exception
عرض الإجابة
اجابة صحيحة: C
السؤال #66
Which of the following is within the context of the Closing a Project process?
A. Provide an opportunity to ensure that all unachieved goals and objectives are identified
B. Provide a means by which an exception process can be implemented
C. The continuing correct focus of the project should be checked at the end of each stage
D. Used for each delivery stage of the project
عرض الإجابة
اجابة صحيحة: A
السؤال #67
What is defined within the Organization theme?
A. Project resource requirements
B. Project acceptance criteria
C. Responsibilities for managing teams
D. Jobs for individuals to perform
عرض الإجابة
اجابة صحيحة: C
السؤال #68
Which is a typical core activity within configuration management?
A. uality assurance
B. isk management
C. erification and audit
D. rogress reporting
عرض الإجابة
اجابة صحيحة: C
السؤال #69
Which of the following is carried out as part of the initiation stage?
A. Appoint the Executive and Project Manager
B. Define the method of delivering the chosen business solution
C. Define how the quality required by the customer will be achieved?
D. Agree tolerances for each Work Package
عرض الإجابة
اجابة صحيحة: C
السؤال #70
Which of the following best defines a project output?
A. The information required for decision-making purposes
B. The measurable improvement resulting from an outcome
C. The result of the change derived from using the project's outputs
D. Any one of the project's specialist products
عرض الإجابة
اجابة صحيحة: D
السؤال #71
What is an objective of a quality review?
A. Determine the quality responsibilities of the project management team
B. Agree the quality method that will be applied to a product
C. Formulate ideas on how the product will be developed
D. Provide consultation with a range of key interested parties regarding a product's quality
عرض الإجابة
اجابة صحيحة: D
السؤال #72
If the Project Board wish to ensure the Communications Management Strategy covers all the stakeholders requirements for the next stage, which project management team role may they appoint to check this for them?
A. Project Assurance
B. Project Support
C. Project Manager
D. Quality Assurance
عرض الإجابة
اجابة صحيحة: A
السؤال #73
The creation of an Exception Plan often follows which of the following situations?
A. A time or cost slippage occurring during a management stage
B. An Exception Report being submitted to the Project Board in the case of a management stage being forecast to exceed its tolerance
C. A Stage Plan updated due to an urgent corrective action being taken by the Project Manager
D. A newly identified risk being captured and documented in the Risk Register
عرض الإجابة
اجابة صحيحة: B
السؤال #74
According to PRINCE2, which of the following is a benefit?
A. An improved business operation
B. The measurable improvement resulting from an outcome
C. The tangible or intangible product resulting from a planned activity
D. The result of change, normally affecting real-world behaviour and/or circumstances
عرض الإجابة
اجابة صحيحة: B
السؤال #75
Identify the missing word in the following sentence. The guiding obligations and good practices which determine whether the project is genuinely being managed usingPRINCE2 form the [ ? ] of the method.
A. Principles
B. Themes
C. Processes
D. Techniques
عرض الإجابة
اجابة صحيحة: A
السؤال #76
Which is NOT a PRINCE2 integrated element?
A. The principles
B. The techniques
C. The themes
D. Tailoring PRINCE2 to the project environment
عرض الإجابة
اجابة صحيحة: B
السؤال #77
Which of the following statements are true regarding the product-based planning technique?1. Product Descriptions show the hierarchy of a Plan's products2. Identifying activities and dependencies is a key task of product-based planning
A. Only 1 is true
B. Only 2 is true
C. Both 1 and 2 are true
D. Both 1 and 2 are false
عرض الإجابة
اجابة صحيحة: D
السؤال #78
Which part of the project management team is responsible for briefing corporate or programme management about project progress?
A. Team Manager
B. Project Support
C. Project Board
D. Project Manager
عرض الإجابة
اجابة صحيحة: C
السؤال #79
Identify the missing word in the following sentence... The purpose of the [ ? ] theme is to define and implement the means by which the project will create and verify products that are fit for purpose.
A. Plans
B. Change
C. Organization
D. Quality
عرض الإجابة
اجابة صحيحة: D
السؤال #80
Which of the following is NOT established as part of the pre-project work?
A. A Plan for the work of initiation
B. Information on the various ways the project can be delivered
C. A description of what the project is to deliver
D. A plan for how and when a measurement of the achievement of the project's benefits can be made
عرض الإجابة
اجابة صحيحة: D
السؤال #81
Which PRINCE2 role has a specific responsibility for planning, monitoring and managing the team's work?
A. Senior Supplier
B. Project Support
C. Team Manage
D. Project Manager
عرض الإجابة
اجابة صحيحة: C
السؤال #82
Which project characteristic refers to a project involving a team of people working together to introduce a change that will impact others outside the team and sometimes other organizations?
A. Temporary
B. Cross-functional
C. Introduces business change
D. Uniqueness
عرض الإجابة
اجابة صحيحة: B
السؤال #83
Which of the following statements describes a risk cause?
A. The area of uncertainty in terms of the threat or the opportunity
B. The situation that gives rise to the risk
C. The impact(s) that the risk would have on the project objectives should the risk materialize
D. How soon in the future the risk is likely to occur
عرض الإجابة
اجابة صحيحة: B
السؤال #84
What is a purpose of the Progress theme?
A. Identify, assess and control uncertainty
B. To establish mechanisms to monitor and control what has happened against what had been planned
C. Facilitate communication and control by defining the means of delivering the products
D. Define and implement the means by which the project will create and verify products which are fit for purpose
عرض الإجابة
اجابة صحيحة: B
السؤال #85
Which is assumed to be a customer's responsibility in the PRINCE2 customer/supplier environment?
A. Specify the desired result
B. Provide the resources and skills to deliver the desired result
C. Ensure the technical integrity of a project
D. Develop a project's products
عرض الإجابة
اجابة صحيحة: A
السؤال #86
If, at the end of each stage, circumstances external to the project had changed which affect the project's costs, risks and benefits, which product should be updated to reflect this?
A. Exception Plan
B. Project Plan
C. Project Brief
D. Business Case
عرض الإجابة
اجابة صحيحة: B
السؤال #87
Which role has a specific responsibility for identifying and advising the Project Manager of any issues and risks associated with a Work Package?
A. Senior Supplier
B. Team Manager
C. Project Support
D. Project Assurance
عرض الإجابة
اجابة صحيحة: B
السؤال #88
According to the Change theme, which of the following contains the steps of the recommended issue and change control procedure?
A. Capture, Examine, Analyze Impact, Review Probability, Implement Action
B. Capture, Log, Review, Resolve
C. Assess, Decide, Escalate, Implement
D. Capture, Examine, Propose, Decide, Implement
عرض الإجابة
اجابة صحيحة: D
السؤال #89
When is the Stage Plan for project initiation produced?
A. Immediately prior to the authority to deliver a project has been given
B. Before the Project Board authorize the initiation of the project
C. After the Project Plan has been produced
D. During Managing a Stage Boundary process
عرض الإجابة
اجابة صحيحة: B
السؤال #90
Which of the following are benefits of using PRINCE2?1. Provides a common vocabulary for all project participants, promoting effective communication2. Promotes regular progress meetings for senior management3. Plans are carefully designed to meet the needs of the different levels in the project organization, improving communication and control4. Defines a thorough but economic structure of reports
A. 1, 2, 3
B. 1, 2, 4
C. 1, 3, 4
D. 2, 3, 4
عرض الإجابة
اجابة صحيحة: C
السؤال #91
What is NOT identified when creating a product breakdown structure?
A. Products to be created in-house
B. Products to be modified
C. Resources required to produce the products
D. Products to be created by an external third party
عرض الإجابة
اجابة صحيحة: C
السؤال #92
Which of the following is a quality review team role?
A. Producer
B. Approver
C. Administrator
D. Project Manager
عرض الإجابة
اجابة صحيحة: C
السؤال #93
Which role has a specific responsibility for managing the information flows between the directing and delivering levels of the project?
A. Project Manager
B. Project Support
C. Team Manager
D. Senior User
عرض الإجابة
اجابة صحيحة: A
السؤال #94
Which of the following products would be at the centre of any impact assessments of risks, issues and changes?
A. Highlight Report
B. Business Case
C. Lessons Log
D. Risk Management Strategy
عرض الإجابة
اجابة صحيحة: B
السؤال #95
Which of the following project management team roles can be shared?1. Project Assurance2. Executive3. Senior User4. Senior Supplier
A. 1, 2, 3
B. 1, 3, 4
C. 2, 3, 4
D. 1, 2, 4
عرض الإجابة
اجابة صحيحة: B
السؤال #96
Which product is used to inform the Project Board of a forecast deviation of stage-level tolerance?
A. Exception Plan
B. Exception Report
C. Off-specification
D. Highlight Report
عرض الإجابة
اجابة صحيحة: B
السؤال #97
Which role is responsible for briefing corporate or programme management about project progress?
A. Team Manager
B. Project Support
C. Project Board
D. Project Manager
عرض الإجابة
اجابة صحيحة: C
السؤال #98
Which is NOT established as part of the Starting Up a Project process?
A. A Plan for the work of initiation
B. Information on the various ways the project can be delivered
C. A description of what the project is to deliver
D. A plan for how and when a measurement of the achievement of the project's benefits can be made
عرض الإجابة
اجابة صحيحة: D
السؤال #99
Which product should define how the budget for responding to potential threats and opportunities will be used?
A. Risk Management Strategy
B. Risk Register
C. Issue Register
D. Project Plan
عرض الإجابة
اجابة صحيحة: A
السؤال #100
Which role is accountable to corporate or programme management for the ultimate success of the project?
A. Project Board
B. Project Manager
C. Senior User
D. Change Authority
عرض الإجابة
اجابة صحيحة: A
السؤال #101
Which role organizes and chairs any Project Board reviews?
A. Project Manager
B. Executive
C. Team Manager in the current stage
D. Member of Project Support with administrative skills
عرض الإجابة
اجابة صحيحة: B
السؤال #102
The Controlling a Stage process is used for which of the following?
A. Day-to-day management of each management stage of a project
B. Closure of the project prematurely or at the project's natural end
C. Creation and quality control of the specialist products
D. Preparing a Stage Plan near the end of each stage
عرض الإجابة
اجابة صحيحة: A
السؤال #103
Which role is part of the project management team?
A. Change Authority
B. Stakeholder
C. Quality assurance
D. Corporate or programme management
عرض الإجابة
اجابة صحيحة: A
السؤال #104
Which statement about the waterfall methodology definition is CORRECT?
A. It states that deadlines should not be moved
B. It has distinct goals for each stage of development
C. It is a behavior that involves making things transparent
D. It promotes the use of experiments carried out in a scientific way
عرض الإجابة
اجابة صحيحة: B
السؤال #105
Which of the following is a specific quality review role responsible for submitting questions on a product?
A. User
B. Approver
C. Reviewer
D. Project Support
عرض الإجابة
اجابة صحيحة: C
السؤال #106
A pre-requisite of effective issue and change control is the establishment of which of the following?
A. Use of a change budget and change authority
B. A risk management procedure
C. A configuration management system
D. A Quality Management Strategy
عرض الإجابة
اجابة صحيحة: C
السؤال #107
In PRINCE2, the information regarding the business justification for the project is normally documented in which management product?
A. Business Case
B. Benefits Review Plan
C. Project Product Description
D. Communication Management Strategy
عرض الإجابة
اجابة صحيحة: A
السؤال #108
Which of the following are correct regarding the definition of a technical stage?1. Technical stages never overlap2. They are typified by the use of a particular set of specialist skills 3. Cover elements such as design, build and implementation4. The work can be grouped by the set of techniques used
A. 1, 2, 3
B. 1, 2, 4
C. 1, 3, 4
D. 2, 3, 4
عرض الإجابة
اجابة صحيحة: D
السؤال #109
Which of the following is a TRUE principle of a PRINCE2 project?
A. Please refer to section 2
B. Work Package level activities are identified during Starting up a Project
C. A project has defined and agreed roles and responsibilities
D. Every project will need a different project management approach
عرض الإجابة
اجابة صحيحة: B
السؤال #110
Which is NOT an objective of the Directing a Project process?
A. Ensure the plans for realizing the post-project benefits are managed and reviewed
B. Provide corporate or programme management with an interface to the project
C. Ensure there is a common understanding of the reasons for doing the project
D. Ensure there is authority to close the project
عرض الإجابة
اجابة صحيحة: C
السؤال #111
Which role has a specific responsibility for checking that the project remains aligned to the corporate or programme strategy?
A. Project Manager
B. Project Assurance
C. Senior User
D. Senior Supplier
عرض الإجابة
اجابة صحيحة: B
السؤال #112
Which process can trigger a premature close of the project?
A. Directing a Project
B. Controlling a Stage
C. Managing a Stage Boundary
D. Closing a Project
عرض الإجابة
اجابة صحيحة: A
السؤال #113
Which of the following describes the situation when an Issue Report would be produced?
A. When ever the Project Board instruct the Project Manager
B. It is only created for those issues that need to be handled formally
C. Every time someone wishes to bring anything to the attention of the Project Manager
D. Only if the Project Manager feels it is necessary
عرض الإجابة
اجابة صحيحة: B
السؤال #114
What is a purpose of the Risk Management Strategy?
A. Describes in detail each risk identified in the project and how each risk should be managed
B. Describes how each risk owner and risk actionee will manage and fund the actions to mitigate each risk
C. Describes the risk response actions taken to mitigate the project's risks
D. Describes the techniques and standards to be applied and the responsibilities for achieving effective risk management procedures
عرض الإجابة
اجابة صحيحة: D
السؤال #115
Which product is used to inform the Project Board of a forecast deviation of stage-level tolerance?
A. Exception Plan
B. Exception Report
C. Off-specification
D. Highlight Report
عرض الإجابة
اجابة صحيحة: B
السؤال #116
Which statement about the PRINCE2 Agile behaviour ‘collaboration’ is CORRECT?
A. It allows many small learnings to accumulate over time
B. It allows the delivery team to decide how best to get the job done
C. It creates a shared ownership of goals
D. It uses the most effective channel to communicate
عرض الإجابة
اجابة صحيحة: C
السؤال #117
What name is given to the permissible deviation allowed above and below a plan's target for time and cost without escalating the deviation to the next level of management?
A. Concession
B. Tolerance
C. Project Issue
D. Off-specification
عرض الإجابة
اجابة صحيحة: B
السؤال #118
What should the business case state about the minimum viable product (MVP)?
A. When the MVP will be defined
B. That the MVP must go into operational use
C. What the MVP is
D. That the MVP is the same as project viability
عرض الإجابة
اجابة صحيحة: B
السؤال #119
Which of the following would be done once the Project Board have authorized initiation?
A. Create the initiation Stage Plan
B. Establish who needs information, when and in what format
C. Establish the quality expectations of the customer
D. Define how the project will deliver the chosen business solution
عرض الإجابة
اجابة صحيحة: B
السؤال #120
User and Supplier are two of the three primary stakeholder interests that must be represented on the Project Board at all times. What is the third interest?
A. Customer
B. Business
C. Programme
D. Corporate
عرض الإجابة
اجابة صحيحة: B
السؤال #121
Which project management team role has a specific responsibility for ensuring that the quality activities relating to products at all stages has appropriate user representation?
A. Project Manager
B. Executive
C. Project Assurance
D. Quality Assurance
عرض الإجابة
اجابة صحيحة: C
السؤال #122
Which of the following is FALSE regarding the Change theme?
A. Change control should be used to prevent changes being made to baselined products
B. Issues can affect the project's performance targets of time, cost, quality, scope, benefits and risk
C. A pre-requisite of effective issue and change control would be an appropriate configuration management system
D. Without issue and change control being applied, a project will become unresponsive to its stakeholders
عرض الإجابة
اجابة صحيحة: A
السؤال #123
Which best describes a stakeholder?
A. Only those people internal to the project team
B. Anyone that may affect the project
C. Anyone that can affect, be affected by, or perceive to be affected by an initiative
D. Someone who has a financial interest/stake in an initiative
عرض الإجابة
اجابة صحيحة: C
السؤال #124
Which is within the context of the Managing Product Delivery process?
A. Receiving and signing off completed Work Packages
B. Reviewing the work situation and triggering new Work Packages
C. The continuing correct focus of the project should be confirmed at the end of each stage
D. Demonstrate that each product meets its quality criteria through carrying out the specified quality methods
عرض الإجابة
اجابة صحيحة: C
السؤال #125
Which of the following management levels sits outside of the project management team?
A. Directing
B. Managing
C. Corporate or programme management
D. Delivering
عرض الإجابة
اجابة صحيحة: C
السؤال #126
What is produced by the Project Manager to define and keep control of the work to build products?
A. Product Status Account
B. Checkpoint Report
C. Highlight Report
D. Work Package
عرض الإجابة
اجابة صحيحة: D
السؤال #127
According to PRINCE2, as well as holding informal problems/concerns, which product can also be used to record required actions or significant events not caught elsewhere?
A. Daily Log
B. Risk Register
C. Issue Register
D. Project notebook
عرض الإجابة
اجابة صحيحة: A
السؤال #128
Which statement regarding a project's outputs, outcomes and benefits is correct?
A. All outputs have tangible benefits
B. Outcomes are the long term results of business benefits
C. Outputs are changes in the way the project's products are used
D. Benefits are measurable improvements resulting from project outcomes
عرض الإجابة
اجابة صحيحة: D
السؤال #129
Where would a Team Manager find information regarding the specific quality required for a product?
A. Product Description
B. Quality Register
C. Quality Management Strategy
D. Checkpoint Report
عرض الإجابة
اجابة صحيحة: A
السؤال #130
What is a purpose of the Communication Management Strategy?
A. Ensuring the project team can use the required reporting tools
B. Producing reports for the Project Board
C. Defining the communication method between the Project Board and corporate or programme management
D. Ensuring stakeholders are aware of their responsibilities
عرض الإجابة
اجابة صحيحة: C
السؤال #131
Which of the following would be defined within the Project Brief?
A. The Communication Management Strategy
B. The scope of the project
C. The initiation Stage Plan
D. The Lessons Report for the project
عرض الإجابة
اجابة صحيحة: B
السؤال #132
Which is NOT included in the PRINCE2 definition of a project?
A. A project is a temporary organization
B. A project's purpose is to deliver one or more business products
C. A project is part of 'business as usual'
D. A project is based on an agreed Business Case
عرض الإجابة
اجابة صحيحة: C
السؤال #133
Which of the following is a Project Board control?
A. Project-level tolerance
B. Stage-level tolerance
C. Checkpoint Report
D. Quality Register
عرض الإجابة
اجابة صحيحة: B
السؤال #134
What is a purpose of the Change theme?
A. Prevent change to anything agreed in the Project Initiation Documentation
B. Ensure any potential changes to baselined products are controlled
C. Ensure that the correct versions are delivered to the customer
D. Assess changes to only the specialist products
عرض الإجابة
اجابة صحيحة: B
السؤال #135
In which process is it decided that an Exception Plan should be created to replace a Stage Plan?
A. Directing a Project
B. Controlling a Stage
C. Managing a Stage Boundary
D. Closing a Project
عرض الإجابة
اجابة صحيحة: A
السؤال #136
For whom does the Senior User make decisions on behalf of?
A. Those who will provide the necessary skills to produce the project product
B. Those who will operate and maintain the project's products
C. Those with an interest in how the project meets a business need
D. Quality Assurance
عرض الإجابة
اجابة صحيحة: B
السؤال #137
What is the name given to the individual assigned to carry out a risk response action or actions to respond to a particular risk or set of risks?
A. Risk Manage
B. Risk Coordinator
C. Risk Actionee
D. Risk Owner
عرض الإجابة
اجابة صحيحة: C

عرض الإجابات بعد التقديم

يرجى إرسال البريد الإلكتروني الخاص بك والواتس اب للحصول على إجابات الأسئلة.

ملحوظة: يرجى التأكد من صلاحية معرف البريد الإلكتروني وWhatsApp حتى تتمكن من الحصول على نتائج الاختبار الصحيحة.

بريد إلكتروني:
رقم الواتس اب/الهاتف: