لا تريد أن تفوت شيئا؟

نصائح اجتياز امتحان الشهادة

آخر أخبار الامتحانات ومعلومات الخصم

برعاية وحديثة من قبل خبرائنا

نعم، أرسل لي النشرة الإخبارية

خذ اختبارات أخرى عبر الإنترنت

السؤال #1
What is the purpose of the Large Solution level in SAFe?
A. To coordinate the work of multiple Agile Teams on the Agile Release Train (ART)
B. To regulate large batch delivery across multiple ARTs at the Solution level
C. To coordinate multiple Agile Release Trains that develop the same Solutioncorrect
D. To create large Portfolio-level Solutions that the ART can use to create organizational alignment
عرض الإجابة
اجابة صحيحة: C
السؤال #2
Who is responsible for assisting to establish Continuous Integration in SAFe?
A. Agile Teams
B. The System Architect/Engineer
C. Shared Services
D. The System Team
عرض الإجابة
اجابة صحيحة: D
السؤال #3
How are the program risks, that have been identified during Pl Planning, categorized?
A. Resolved, Owned, Acknowledged, Managed
B. Removed, Owned, Accepted, Managed
C. Resolved, Owned, Accepted, Mitigated
D. Removed, Owned, Acknowledged, Mitigated
عرض الإجابة
اجابة صحيحة: C
السؤال #4
A team integrates and tests the Stories on the last day of the Iteration. This has become a pattern for the last three Iterations. Why is this considered an anti-pattern?
A. Because the team is waterfalling the Iterationcorrect
B. Because the team demonstrates the full Stories to the Product Owner during the Iteration review
C. Because the team consistently meets their commitments, and the Product Owner accepts the Stories
D. Because it is difficult to manage dependencies with other teams
عرض الإجابة
اجابة صحيحة: A
السؤال #5
Achieving the goals of Release on Demand requires an understanding of how to decouple what?
A. The release from deployment
B. The release from System Demos
C. The release from lteration Demos
D. The release from Program Increments
عرض الإجابة
اجابة صحيحة: A
السؤال #6
What action should be taken on relentless improvement backlog items from the problem-solving workshop?
A. Assign the items to the team best suited to solve them
B. Assign points or prioritization levels for each item
C. Use the items as direct input into the Pl Planning event that follows
D. Calculate item cost before continuing
عرض الإجابة
اجابة صحيحة: C
السؤال #7
Which two statements are true about a Feature? (Choose two.)
A. It is developed within a single Agile Teamcorrect
B. It is fully completed by a single Agile Release Train within one PIcorrect
C. It is prioritized using weighted shortest job firstcorrect
D. It has one Capability as a parent
عرض الإجابة
اجابة صحيحة: ABC
السؤال #8
How can a Scrum Master help the team remain focused on achieving their Iteration goals?
A. By supporting the rules of the team process
B. By leading a team's efforts in relentless improvements
C. By eliminating impedimentscorrect
D. By exhibiting Lean-Agile Leadership
عرض الإجابة
اجابة صحيحة: C
السؤال #9
What is a benefit of an Agile Release Train that has both cadence and synchronization?
A. The Agile Release Train is able to control the injection on new work
B. Dependencies are identified across the Agile Release Train
C. Teams participate in the portfolio backlog refinement
D. The entire system is iteratingcorrect
عرض الإجابة
اجابة صحيحة: D
السؤال #10
Which pillar of the SAFe House of Lean supports building long-term partnerships based on trust?
A. Flow
B. Respect for People and Culture
C. Lean-Agile Leadership
D. Innovation
عرض الإجابة
اجابة صحيحة: B
السؤال #11
What is the primary goal of decentralized decision-making?
A. To resolve dependencies
B. To minimize VVIP www
C. To empower knowledge workers
D. To reduce delaycorrect
عرض الإجابة
اجابة صحيحة: D
السؤال #12
What should be the first step a team should take to feed potential problems into the Problem Solving workshop?
A. Identify enablers needed to build out the Architectural Runway
B. Analyze quantitative & qualitative metrics
C. Conduct a short team retrospective
D. Review feedback from the System Demo
عرض الإجابة
اجابة صحيحة: C
السؤال #13
What goes into the Portfolio Backlog?
A. Strategic Themes
B. Projects
C. Capabilities
D. Epicscorrect
عرض الإجابة
اجابة صحيحة: D
السؤال #14
Which statement is true about batch size, lead time, and utilization?
A. Higher team member utilization leads to longer lead timescorrect
B. There is no direct relationship between lead time and utilization
C. As batch size increases, lead time decreases
D. There is no direct relationship between lead time and batch size
عرض الإجابة
اجابة صحيحة: A
السؤال #15
If the distance between the arrival and departure curves on a team's cumulative flow diagram is growing apart, what is likely happening?
A. Lead time is increasingcorrect
B. Unplanned work is pushed into the backlog
C. WIP is decreasing
D. The backlog is being reprioritized
عرض الإجابة
اجابة صحيحة: A
السؤال #16
In complex systems development, what do local integration points ensure?
A. That a common understanding of the system design is distributed to the entire team
B. That an application passes all quality assurance (QA) tests before being released to production
C. That each Capability of the system is meeting its responsibilities in contributing to the overall Solution Intent
D. That all team members have access to the current product status
عرض الإجابة
اجابة صحيحة: C
السؤال #17
Which of the SAFe Core Values enables trust across the ART?
A. Transparencycorrect
B. Adaptation
C. Built-in Quality
D. Decentralized decision-making
عرض الإجابة
اجابة صحيحة: A
السؤال #18
How does a Scrum Master lead a team's efforts in relentless improvement?
A. By facilitating the Iteration Retrospective
B. By focusing on the Iteration goals
C. By eliminating impediments
D. By facilitating a team meeting
عرض الإجابة
اجابة صحيحة: A
السؤال #19
The Agile Team includes the Scrum Master and which other key role?
A. Product Ownercorrect
B. Release Train Engineer
C. Project Manager
D. Product Manager
عرض الإجابة
اجابة صحيحة: A
السؤال #20
Which two Framework elements would a Scrum Master have the strongest connection and most frequent interaction? (Choose two.)
A. Business Ownerscorrect
B. Release Train Engineercorrect
C. Systems Team
D. Product Ownercorrect
E. Epic Owner
عرض الإجابة
اجابة صحيحة: ABD
السؤال #21
What are two timestamps required to measure lead time when using a Team Kanban board? (Choose two.)
A. When the Story is released to users and validatedcorrect
B. When the Story is deployed
C. When the Agile Team pulls a Story onto the boardcorrect
D. When the Story is accepted by the Product Ownercorrect
E. When the team completes validation of the Story
عرض الإجابة
اجابة صحيحة: ACD
السؤال #22
When is collaboration with System Architects and the Systems Team likely to have the greatest impact on Solution development?
A. At the Inspect and Adapt event
B. During the daily stand-up
C. At the System Demo
D. During Pl Planning
عرض الإجابة
اجابة صحيحة: D
السؤال #23
What is the primary measurement during Inspect and Adapt?
A. Program predictability measurecorrect
B. Team NPS score
C. Number of Features delivered
D. Number of automated tests
عرض الإجابة
اجابة صحيحة: A
السؤال #24
What is one output from the problem-solving workshop?
A. ROAMed risks
B. All the potential Solutions the team could identify
C. An assessment report
D. Top improvement items for the next PIcorrect
عرض الإجابة
اجابة صحيحة: D
السؤال #25
Why is the program predictability measure the primary Metric used during the quantitative measurement part of the Inspect and Adapt event?
A. To measure the predictability of business value delivered in the PI timeboxcorrect
B. To predict the scope of the remaining requirements in the Program Backlog
C. To forecast when remaining features could be delivered to customers
D. To match customer demand to the Agile Release Train's velocity
عرض الإجابة
اجابة صحيحة: A
السؤال #26
A Scrum Master is asked to help an Agile Release Train that has struggled through multiple Pls. They just finished the second Iteration in the current PI and have nothing to show at the System Demo. The ART stakeholders are concerned. What should be done?
A. Stop working on any new functionality and fully integrate and test the system; adjust scope based on what is learnedcorrect
B. Have every team demonstrate their team increment to the stakeholders separately in the team branch
C. Find a vendor that specializes in integrating system increments from multiple teams
D. Re-architect the system so that there are no dependencies between the teams; integration is not required at this time
عرض الإجابة
اجابة صحيحة: A
السؤال #27
Which two events provide opportunities for the team to collaborate? (Choose two.)
A. Iteration Planningcorrect
B. Portfolio Sync
C. Solution Demo
D. Pre-PI Planning
E. Backlog refinementcorrect
عرض الإجابة
اجابة صحيحة: AE
السؤال #28
What is an example of Scrum Master servant leader behavior?
A. Focuses on the day-to-day team activities
B. Keeps their opinions to themselves
C. Strives to create a conflict-free environment
D. Uses persuasion instead of authority
عرض الإجابة
اجابة صحيحة: D
السؤال #29
How is average lead time measured in a Kanban system?
A. By taking the average velocity over the last three iterations
B. Measure the vertical distance between arrival and departure lines on a cumulative flow diagram
C. Measure the horizontal distance between arrival and departure lines on a cumulative flow diagramcorrect
D. Measure the lead time for at least three items and calculate the statistical mean of the items
عرض الإجابة
اجابة صحيحة: C
السؤال #30
What is one problem with phase-gate Milestones?
A. They assume a point Solution exists and can be built right the first timecorrect
B. They force design decisions too late in the process
C. They account for variability inherent in the process
D. They require the Product Owner to act as gatekeeper or guardian of the process
عرض الإجابة
اجابة صحيحة: A

عرض الإجابات بعد التقديم

يرجى إرسال البريد الإلكتروني الخاص بك والواتس اب للحصول على إجابات الأسئلة.

ملحوظة: يرجى التأكد من صلاحية معرف البريد الإلكتروني وWhatsApp حتى تتمكن من الحصول على نتائج الاختبار الصحيحة.

بريد إلكتروني:
رقم الواتس اب/الهاتف: