An architect is designing a solution for an environment that has an application consisting of five resource-intensive virtual machines. Which design recommendation should the architect make to avoid resource bottlenecks?
A. Create a cluster with three hosts and only run the application virtual machines on this cluster
B. Create a cluster with six hosts and use automated placement rules to keep the application virtual machines together
C. Create a cluster with six hosts and use automated placement rules to keep the application virtual machines apart
D. Create a cluster with four hosts and use rules to prioritize the resources for the application virtual machines
عرض الإجابة
اجابة صحيحة: C
السؤال #2
A company is expanding and will be deploying new vSphere environments in multiple new locations. All environments use datastores backed by multiple storage technologies and vendors. How can the architect create a design to efficiently and repeatedly distribute existing company virtual machine (VM) templates to multiple new locations?
A. Use storage array replication tools to replicate the storage volume holding the company VM templates to each remote site
B. Upload company templates to a cloud provider and download to each new location
C. Create a published content library and have the new locations subscribe to it
D. Create a local content library at each site and manually copy only needed templates
عرض الإجابة
اجابة صحيحة: C
السؤال #3
An architect is considering placement of virtual machines within an existing VMware software-defined data center (SDDC). During the discovery phase, the following information is documented: Cluster One ? Six ESXi hosts ? vSphere HA with host failures cluster tolerates = 1 ? Proactive HA is enabled and set to automated ? Fully Automated vSphere DRS ? Transparent Page Sharing (TPS) is enabled Cluster Two ? Eight ESXi hosts ? vSphere HA with host failures cluster tolerates = 1 ? Proactive HA is disabled ? Part
A. All virtual machines matching Virtual Machine Resource Profile 2 should be placed on Cluster One
B. All virtual machines matching Virtual Machine Resource Profile 1 should be placed on Cluster One
C. All virtual machines matching Virtual Machine Resource Profile 2 should be placed on Cluster Two
D. All virtual machines matching Virtual Machine Resource Profile 1 should be placed on Cluster Two
E. All virtual machines matching Virtual Machine Resource Profile 2 should be placed on Cluster Three
عرض الإجابة
اجابة صحيحة: CD
السؤال #4
An architect is designing a solution for a customer to meet the following business objectives: Pass compliance audits Reuse compute hardware Grow by 10% per year Move to a subscription-based consumption model Which business objective translates as a conceptual model constraint?
A. Pass compliance audits
B. Reuse compute hardware
C. Move to a subscription-based consumption model
D. Grow by 10% per year
عرض الإجابة
اجابة صحيحة: A
السؤال #5
An application owner is concerned about their front-end web servers suffering an outage in the event of a host failure. Which functional requirement could the architect include in the application design to mitigate this concern?
A. The platform must include configuration rules to separate the web servers
B. The platform must include configuration rules to restart the web servers upon host failure
C. The platform must be configured with resource scheduling in fully automated mode
D. The platform must include configuration rules to reset the web servers when guest heartbeats are not received
عرض الإجابة
اجابة صحيحة: A
السؤال #6
Which two of the listed requirements would be classified as performance non-functional requirements? (Choose two.)
A. The vSphere platform must be able to provide a recovery time objective of 30 minutes
B. The vSphere platform must be able to provide a minimum throughput of 400 MB/s
C. The vSphere platform must be able to provide N+1 redundancy
D. The vSphere platform must be able to provide a maximum read latency of 15 ms
E. The vSphere platform must be able to provide a service-level agreement (SLA) of 99,9%
عرض الإجابة
اجابة صحيحة: BD
السؤال #7
Following a review of security requirements, an architect has confirmed the following requirements: REQ001- A clustered firewall solution must be placed at the perimeter of the hosting platform, and all ingress and egress network traffic will route via this device. REQ002- A distributed firewall solution must secure traffic for all virtualized workloads. REQ003- All virtualized workload, hypervisor, firewall and any management component system events must be monitored by security administrators. REQ004- The
A. A clustered firewall solution must be placed at the perimeter of the hosting platform, and all ingress and egress network traffic will route via this device
B. A distributed firewall solution must secure traffic for all virtualized workloads
C. The hosting platforms security information and event management (SIEM) system must be scalable to 20,000 events per second
D. The hosting platforms storage must be configured with data-at-rest encryption
E. The hosting platform limits access to authorized users
F. All virtualized workload, hypervisor, firewall and any management component system events must be monitored by security administrators
عرض الإجابة
اجابة صحيحة: ACD
السؤال #8
An architect will be taking over control of a former Linux server fleet and repurposing the hardware into a new vSphere cluster. The current environment is already connected to the network but the hosts do not have any local disks. Since the fleet hardware is uniform, the architect can use a single ESXi image. All hosts within the cluster have the same CPU and memory capacity. Which ESXi deployment method should the architect use?
A. Stateless cached vSphere Auto Deploy
B. Stateless vSphere Auto Deploy
C. Manual install of each ESXi host with an image from USB
D. Stateful vSphere Auto Deploy
عرض الإجابة
اجابة صحيحة: B
السؤال #9
The DevOps team at an organization is preparing to build and package virtual machine (VM) images that will be added to a content library for a new vSphere environment. Users will deploy virtual machines from the content library. The solutions architect is gathering requirements to help the DevOps team decide between the use of VM templates versus Open Virtualization Format (OVF) templates in the content library. Which requirement would influence the design decision to use OVF templates in the content librar
A. Templates must be able to support license agreement acceptance during deployment
B. Templates must be encrypted
C. vSphere Storage DRS must be supported
D. Templates must be automatically migrated to another ESXi host when a host is inaccessible
عرض الإجابة
اجابة صحيحة: A
السؤال #10
An architect is preparing a design for a company planning digital transformation. During the requirements gathering workshop, the following requirements (REQ) and constraints (CON) are identified: ? REQ01 The platform must host different types of workloads including applications that must be compliant with internal security standard. ? REQ02 The infrastructure must initially run 100 virtual machines. REQ03 Ten of the virtual machines must be compliant with internal security standard. ? REQ04 The internal se
A. Use Network I/O Control to ensure the internal security zone has higher share value
B. Purchase additional servers and plan separate, isolated clusters for workloads that must be compliant with internal security standard
C. Use a single cluster and ensure that different security zones are separated at least with dedicated VLANs and firewall
D. Use a single cluster and configure DRS anti-affinity rules to ensure internal security compliant virtual machines cannot migrate between ESXi hosts
عرض الإجابة
اجابة صحيحة: C
السؤال #11
Following a review of security requirements, an architect has confirmed the following requirements: REQ001- A clustered firewall solution must be placed at the perimeter of the hosting platform, and all ingress and egress network traffic will route via this device. REQ002- A distributed firewall solution must secure traffic for all virtualized workloads. REQ003- All virtualized workload, hypervisor, firewall and any management component system events must be monitored by security administrators. REQ004- The
A. A clustered firewall solution must be placed at the perimeter of the hosting platform, and all ingress and egress network traffic will route via this device
B. A distributed firewall solution must secure traffic for all virtualized workloads
C. The hosting platforms security information and event management (SIEM) system must be scalable to 20,000 events per second
D. The hosting platforms storage must be configured with data-at-rest encryption
E. The hosting platform limits access to authorized users
F. All virtualized workload, hypervisor, firewall and any management component system events must be monitored by security administrators
عرض الإجابة
اجابة صحيحة: ACD
السؤال #12
An architect is designing a new platform. Existing virtual machines will be migrated to this platform. The migration process is defined as follows: - A migration host will be loaded with virtual machines from the old platform. - The migration host will be added to the desired new cluster. - Virtual machines compute and storage will be migrated to desired hosts in the new platform. - The migration host will be removed and added back to the old platform so the process can restart. The following characteristic
A. Large
B. Small
C. Medium
D. Tiny
عرض الإجابة
اجابة صحيحة: A
السؤال #13
An architect is finalizing the design for a new vCenter Server High Availability deployment. What is one thing the architect must document in the design?
A. The load balancing algorithm used by the Management Distributed Virtual Switches (DVS)
B. The SSH configuration settings for the vCenter Server's active node
C. The vCenter Management Network IPv4 addresses for the witness node vCenter Server
D. The details of each of the vCenter Server licenses for active, passive and witness nodes
عرض الإجابة
اجابة صحيحة: B
السؤال #14
An architect is designing a solution for a customer to meet the following business objectives: Pass compliance audits - Reuse compute hardware - Grow by 10% per year - Move to a subscription-based consumption model Which business objective translates as a conceptual model constraint?
A. Pass compliance audits
B. Reuse compute hardware
C. Move to a subscription-based consumption model
D. Grow by 10% per year
عرض الإجابة
اجابة صحيحة: A
السؤال #15
An architect is documenting the design decisions for a new vSphere solution. The following design decision has been made: Create a separate vSphere cluster for the management workloads What could the architect include as justification for this design decision?
A. This increases operational overhead as multiple clusters are required for management and compute workloads
B. This increases capital expenditure as hardware must be purchased for multiple clusters
C. This ensures that compute workloads have no impact on the management workloads
D. This ensures that there is always sufficient capacity available for the compute workloads
عرض الإجابة
اجابة صحيحة: C
السؤال #16
An organization operates a vSphere platform that supports three tiers of virtual machines: Tier 1- for all business-critical applications and services, Tier 2- for line of business services, and Tier 3- for test and development virtual machines. The vSphere platform operates from three sites, named A, B and C; and virtual machines from all tiers run at each location. The operations manager wants to improve services so that the vSphere platform operates with virtual machines running on any site. The Chief Ex
A. DR must be configured as Active/Passive between sites A and B
B. DR must be configured as Active/Active between sites A, B and C
C. DR must be configured as Active/Passive between sites B and C
D. DR must be configured as Active/Active between sites B and C
عرض الإجابة
اجابة صحيحة: D
السؤال #17
An architect is reviewing the information provided by a customer for a new vSphere solution design. The customer has stated that some of the virtual machines (VMs) that will be hosted on the new solution handle credit card information from their users as part of an online payment application, and that some of the information will need to be stored temporarily to allow transactions to be completed. Therefore, the solution must be designed to be able to mask or hash the stored information as they will need to
A. Manageability
B. Performance
C. Security
D. Recoverability
عرض الإجابة
اجابة صحيحة: C
السؤال #18
The following is a list of requirements from a discovery workshop for a new VMware hosting platform system design: REQ001 - The architecture must support recoverability to the VMware Cloud Disaster Recovery (VCDR) service. REQ002 - The architecture must support high availability (HA) and fault tolerance (FT). REQ003 - The architecture must support reducing existing energy consumption and carbon footprint. REQ004 - The architecture must provide support for network virtualization using distributed virtual swi
A. The architecture must support high availability (HA) and fault tolerance (FT)
B. The architecture must support reducing existing energy consumption and carbon footprint
C. The architecture must support recoverability to the VMware Cloud Disaster Recovery (VCDR) service
D. The architecture must provide support for network virtualization using distributed virtual switches
عرض الإجابة
اجابة صحيحة: B
السؤال #19
A company is expanding and will be deploying new vSphere environments in multiple new locations. All environments use datastores backed by multiple storage technologies and vendors. How can the architect create a design to efficiently and repeatedly distribute existing company virtual machine (VM) templates to multiple new locations?
A. Use storage array replication tools to replicate the storage volume holding the company VM templates to each remote site
B. Upload company templates to a cloud provider and download to each new location
C. Create a published content library and have the new locations subscribe to it
D. Create a local content library at each site and manually copy only needed templates
عرض الإجابة
اجابة صحيحة: C
السؤال #20
Which two of the listed requirements would be classified as manageability non-functional requirements? (Choose two.)
A. ESXi clusters must scale when compute resources are sustained above 70% for five business days
B. vSphere Fault Tolerance must be supported to improve application uptime
C. ESXi host updates must be installed within one week of release
D. The vSphere environment must support administrator password rotation
E. ESXi clusters must scale to 500 concurrent virtual machines
عرض الإجابة
اجابة صحيحة: AC
السؤال #21
An architect is redesigning a storage environment to provide simplified management of a VMware environment. The administrators have expressed the need to provision storage and apply a custom set of array features granularly to virtual machines. They will re-use their existing shared storage platform as it does support all modern VMware storage integrations. Which two technologies or features are needed to support the requirements of this project? (Choose two.)
A. vStorage APIs for Storage Awareness (VASA)
B. vSphere Virtual Volumes (vVols)
C. Datastore Clusters
D. vSphere Storage DRS
E. Raw Device Mappings (RDMs)
عرض الإجابة
اجابة صحيحة: AB
السؤال #22
An architect is designing an upgrade to an existing vSphere environment. The project has been created to provide options for enabling growth and scalability, without increasing the data center footprint. The CIO has also tasked the architect with updating data protection operations, from the current agent-based backup approach. During a workshop with key stakeholders, the following information has been noted: The existing vSphere environment uses an external fibre attached storage array for the vSphere envi
A. The architecture will extend the Fibre Channel external storage array, scaling out storage and compute by buying additional storage or server capacity as required
B. The architecture will replace the Fibre Channel storage array with an updated model, scaling out storage capacity as required
C. The architecture will be based on vSAN Ready Nodes, scaling out storage and compute by buying additional hyper-converged servers as required
D. The architecture will be based on stretched vSAN Ready Nodes, scaling out storage and compute by buying additional hyper-converged servers as required
عرض الإجابة
اجابة صحيحة: C
السؤال #23
An architect is designing a new VMware solution for a customer that has a number of different resource profiles. The following are the business requirements for the design: ? The solution must support virtual machines with the following storage profiles: - Write-intensive - Backup - Write-Once-Read-Many (WORM) archive ? The solution must support migration of virtual machine disks between storage profiles. ? The WORM archive data must be located at an isolated secure site. ? The backup storage array must onl
A. The solution will leverage a single storage array for the WORM archive and write-intensive storage profiles
B. The solution will leverage the same array for the backup and write-intensive storage profiles
C. The solution will leverage a different array for each storage profile
D. The solution will leverage a single storage array for all storage profiles
عرض الإجابة
اجابة صحيحة: C
السؤال #24
An architect is tasked with designing a repeatable edge hosting solution using VMware technologies that can be deployed to existing hotels across the world and operate independently of other locations. During interviews with stakeholders, the architect notes the following information: There are 123 hotels in total. All hotels have a minimum of two 1?Gbps connections for guest Internet access. The company operates hotels in four countries: Canada, USA, Cuba and Mexico. The company is rebranding the hotels lo
A. The company is rebranding the hotels located in Mexico
B. The company operates hotels in four countries: Canada, USA, Cuba and Mexico
C. There are 123 hotels in total
D. All hotels have a minimum of two 1?Gbps connections for guest Internet access
عرض الإجابة
اجابة صحيحة: A
السؤال #25
An architect is designing a solution for an environment with a limited number of operating system licenses. How should the architect design the virtual infrastructure to meet the operating system license requirements?
A. Place the hosts into a single cluster and enable automated placement of virtual machines
B. Create rules to restrict placement of virtual machines to specified hosts
C. Create a resource pool and only put the virtual machines that need the operating system licenses within the pool
D. Use standalone ESXi hosts and only apply the operating system licenses to those hosts
عرض الإجابة
اجابة صحيحة: B
السؤال #26
An architect is designing a new vSphere environment to meet the following requirements: ? The environment must support 800 virtual machines. ? The environment will be built initially using 200 hosts. Which vCenter Server appliance deployment size should the architect specify for the design?
A. Large
B. Small
C. X-Large
D. Medium
عرض الإجابة
اجابة صحيحة: D
السؤال #27
An architect is finalizing the design for a new vCenter Server High Availability deployment. What is one thing the architect must document in the design?
A. The load balancing algorithm used by the Management Distributed Virtual Switches (DVS)
B. The SSH configuration settings for the vCenter Server?€?s active node
C. The vCenter Management Network IPv4 addresses for the witness node vCenter Server
D. The details of each of the vCenter Server licenses for active, passive and witness nodes
عرض الإجابة
اجابة صحيحة: B
السؤال #28
Which two of the listed requirements would be classified as performance non-functional requirements? (Choose two.)
A. The vSphere platform must be able to provide a recovery time objective of 30 minutes
B. The vSphere platform must be able to provide a minimum throughput of 400 MB/s
C. The vSphere platform must be able to provide N+1 redundancy
D. The vSphere platform must be able to provide a maximum read latency of 15 ms
E. The vSphere platform must be able to provide a service-level agreement (SLA) of 99,9%
عرض الإجابة
اجابة صحيحة: BD
السؤال #29
An architect is assigned to report available capacity of a vSphere platform and is provided with the following: - Read-only access to the platform’s virtualization monitoring tool - Full access to an internally developed and manually updated Configuration Management Database (CMDB) tool - Access to a document repository containing the go-live design documentation for each application - Links to vendor best practice documentation for many of the deployed applications - Access to the company wide in-guest mon
A. Virtualization monitoring tools
B. Application virtual machine design documents
C. In-guest monitoring tools
D. Application vendor best practice documentation
E. Support organizations Configuration Management Database (CMDB)
عرض الإجابة
اجابة صحيحة: AC
السؤال #30
An architect will be taking over control of a former Linux server fleet and repurposing the hardware into a new vSphere cluster. The current environment is already connected to the network but the hosts do not have any local disks. Since the fleet hardware is uniform, the architect can use a single ESXi image. All hosts within the cluster have the same CPU and memory capacity. Which ESXi deployment method should the architect use?
A. Stateless cached vSphere Auto Deploy
B. Stateless vSphere Auto Deploy
C. Manual install of each ESXi host with an image from USB
D. Stateful vSphere Auto Deploy
عرض الإجابة
اجابة صحيحة: B

View The Updated Vmware Exam Questions

SPOTO Provides 100% Real Vmware Exam Questions for You to Pass Your Vmware Exam!

عرض الإجابات بعد التقديم

يرجى إرسال البريد الإلكتروني الخاص بك والواتس اب للحصول على إجابات الأسئلة.

ملحوظة: يرجى التأكد من صلاحية معرف البريد الإلكتروني وWhatsApp حتى تتمكن من الحصول على نتائج الاختبار الصحيحة.

بريد إلكتروني:
رقم الواتس اب/الهاتف: