A company uses planning optimization in Dynamics 365 Supply Chain Management.A planning optimization job is triggered by mistake from the user interface. The planning optimization job is running withincorrect runtime filters.You need to resolve the issue.What should you do?
A. Cancel the job from the plan history
B. Cancel the job from the dialog box
C. Disable the environment add-in
D. Cancel the planning optimization fit analysis
عرض الإجابة
اجابة صحيحة: A
السؤال #2
A company uses Dynamics 365 Supply Chain Management. You create a product by using an incorrect product dimension group. The product has not yet been released to the legal entities. You need to determine whether you can change the product dimension group. Which two conditions must be met? Each answer presents part of the solution. NOTE: Each correct selection is worth one point. Changing the product dimension group for a product master The setup of the product dimension group for a product master can be cha
A. imensions must not be specified for the product master
B. he item must not already be validated
C. imensions must be specified that match the original but not the new product dimension group
D. he product master must not be released to any legal entities
عرض الإجابة
اجابة صحيحة: AD
السؤال #3
A company operates a chain of retail coffee shops and a distribution center. Each coffee shop and the distribution center aredistinct warehouses.Cups and lids are replenished from a single distribution center.You need to configure store replenishment for coffee cup lids.Which three actions should you perform? Each correct answer presents part of the solution.NOTE: Each correct selection is worth one point.
A. Set the coverage plan by dimension for warehouse on the Storage dimension group
B. Set the minimum item coverage to the safety stock quantity
C. Set the minimum item coverage to the safety stock quantity
D. Create a coverage group assignment for the item
E. Set the minimum item coverage to 0
عرض الإجابة
اجابة صحيحة: ABD
السؤال #4
A company uses the built-in Dynamics 365 Supply Chain Management master planning engine. Planned orders are automatically firming and are firmed during the current week. You need to reconfigure the system for the new Planning Optimization master planning engine. What should you change? https://docs.microsoft.com/en-us/dynamics365/supply-chain/master-planning/planning-optimization/planned-order-firming
A. irming time fence to one week
B. irming time fence to lead-time plus one week
C. pen orders' firming date to be the requirement date
D. irming time fence to be longer than the lead time
E. irming time fence to 0
عرض الإجابة
اجابة صحيحة: A
السؤال #5
You are the planner for a distribution company.You observe an increase in planned orders for item C0001. You must track the source for these planned orders and breakthem out based on their demand. You are not concerned with safety stock maximums for this item.You need to ensure that the master planning batch job will create a unique planned purchase order for every new demandrequirement for C0001.Which coverage code should you use?
A. Manual
B. Period
C. Min/Max
D. Requirement
عرض الإجابة
اجابة صحيحة: D
السؤال #6
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution. After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen. A company uses Dynamics 365 Supply Chain Management to manage inventory. Backo
A. es
B. o
عرض الإجابة
اجابة صحيحة: B
السؤال #7
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution. After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen. A company plans to simplify interactions between purchasing department employe
A. es
B. o
عرض الإجابة
اجابة صحيحة: A
السؤال #8
A company uses planning optimization in Dynamics 365 Supply Chain Management. Automatic firming is enabled.Some of the planned purchase orders are not being firmed as expected. The inventory planners therefore need to manuallyprocess planned purchase orders.You need to include the planned purchase orders in automatic firming.What are two possible configurations you can use? Each correct answer presents a complete solution.NOTE: Each correct selection is worth one point.
A. Lead Time
B. Automatic firming time fence (days)
C. Requirements Date
D. Freeze time fence on master plan
عرض الإجابة
اجابة صحيحة: AB
السؤال #9
A company uses Dynamics 365 Supply Chain Management.The company is consistently short on inventory for a group of produced finished good items. This creates customer serviceissues.You need to ensure that production orders are automatically created when inventory is low.Which two actions should you perform? Each answer represents a partial solution.NOTE: Each correct selection is worth one point.
A. Update the item maximum
B. Update the item minimum
C. Set Capable to Promise
D. Create a safety stock journal
E. Create a transfer journal
عرض الإجابة
اجابة صحيحة: BD

عرض الإجابات بعد التقديم

يرجى إرسال البريد الإلكتروني الخاص بك والواتس اب للحصول على إجابات الأسئلة.

ملحوظة: يرجى التأكد من صلاحية معرف البريد الإلكتروني وWhatsApp حتى تتمكن من الحصول على نتائج الاختبار الصحيحة.

بريد إلكتروني:
رقم الواتس اب/الهاتف: