السؤال #1
Competition, safety, warranty, service costs, and public liability are all characteristics of
A. Aperceived risk
B. Bsupplier-customer agreement
C. Ccost management
D. Dsystem reliability'
عرض الإجابة
اجابة صحيحة: A
السؤال #2
Which of the following nondestructive testing methods can be used to evaluate sub-surface discontinuities in aluminum bar stock? . Microwave. . Magnetic particle. . Pulse echo. . Eddy current.
A. I, II and IV only
B. I and III only
C. III and IV only
D. I and IV only
عرض الإجابة
اجابة صحيحة: C
السؤال #3
What are the major disadvantages of having an improvement team that is too large? I. Difficulty in having constructive input from the entire group. II. Difficulty in arriving at consensus. III. Difficulty in finding large meeting facilities. IV. Difficulty, on the part of the recorder, in keeping up with more paperwork.
A. I only
B. I and II only
C. I, II and III only
D. I, II, III and IV
عرض الإجابة
اجابة صحيحة: B
السؤال #4
If the stated value of a standard is 0.050. and the measurement error is 0.002, which of the following sample data sets shows the greatest precision?
A. 0
B. 0
C. 0
D. 0
عرض الإجابة
اجابة صحيحة: D
السؤال #5
The producer's risk can be determined from the
A. acceptance quality limit (AQL)correct
B. lot tolerance percent defective (LTPD)
C. average outgoing quality limit (AOQL)
D. rejectable quality level (RQL)
عرض الإجابة
اجابة صحيحة: A
السؤال #6
What are the major disadvantages of having an improvement team that is too large? . Difficulty in having constructive input from the entire group. . Difficulty in arriving at consensus. . Difficulty in finding large meeting facilities. . Difficulty, on the part of the recorder, in keeping up with more paperwork.
A. Ionly
B. IandIIonly
C. I,IIandIIIonly
D. I, II,IIIandIV
عرض الإجابة
اجابة صحيحة: B
السؤال #7
The example of a supplier's quality management effort to meet your existing contractual requirements is MOST like . A product audit. . A process audit. . A system audit.
A. Ionly
B. IIonly
C. andIIonly
D. ,IIandIII
عرض الإجابة
اجابة صحيحة: B
السؤال #8
The pre-production or pre-service planning process should include which of the following activities?
A. Preparation of product and process control planscorrect
B. Implementation of process quality audits
C. Development of cost of quality parameters
D. Certification of suppliers
عرض الإجابة
اجابة صحيحة: A
السؤال #9
Which of the following types of planning uses a strategic planning process that relates idealistic goals to work strategy?
A. Yoji planning
B. Hoshin planningcorrect
C. Juran planning
D. Deining planning
عرض الإجابة
اجابة صحيحة: B
السؤال #10
During the building phase of improvement team development, which of the following properly describes team activities? Ⅰ . The team leader is usually directive. Ⅱ . The team leader often delegates tasks. Ⅲ . Team members prioritize and perform duties. Ⅳ . Team members are uncertain of their duties.
A. II and III only
B. I, II and III only
C. I and IV only
D. II, III and IV only
عرض الإجابة
اجابة صحيحة: C
السؤال #11
Which of the following is most important to shaping the culture of an organization?
A. Geographic location
B. Management philosophycorrect
C. Market share
D. Implement ISO
عرض الإجابة
اجابة صحيحة: B
السؤال #12
Short-run SPC should be used in which of the following situations?
A. The coded data being used do not show significant shifts in the process
B. Regular SPC charts show the process to be out of control
C. Many different parts are made in small lots
D. The number of charts currently used needs to be increased to control the process better
عرض الإجابة
اجابة صحيحة: C
السؤال #13
Which of the following is the BEST method to developing materials for a training program on the gaps in performance?
A. Secure a workshop trainer
B. Review a record of activities
C. Set up a one shot case study
D. Allocate employees for training
عرض الإجابة
اجابة صحيحة: B
السؤال #14
In most cases, an improvement team facilitator will NOT normally:
A. Be familiar with problem solving techniques
B. Provide feedback to the group
C. Function as the group leader
D. Summarize key ideas generated by the group
عرض الإجابة
اجابة صحيحة: C
السؤال #15
Failure to cite the significant contributions of other individuals in a final manuscript for publication violates which category of the ASQ Code of Ethics?
A. Fundamental Principles
B. Relations with the Public
C. Relations with Employers and Clients
D. Relations with Peerscorrect
عرض الإجابة
اجابة صحيحة: D
السؤال #16
80° o of weekly inspection non-conforming reports presented to the material review board (MRB) at Marathon Manufacturing Co. end up not being dispositioned for corrective action. Project management developed a risk management plan which included a standard repair manual (SRM) to help mitigate these issues. Only conditions that exceed SRM requirements or specifications will now be forwarded for MRB review. A week after releasing the SRM. the quality engineering team decided to generate and distribute weekly
A. Generating a weekly report of non-conformities that exceed SRM requirement and specifications
B. Distributing weekly alert report of non-conformities to all inspectors
C. Instructing that all employees involved creating those discrepancies be re-trainedcorrect
D. Reducing throughput at Marathon Manufacturing Co
عرض الإجابة
اجابة صحيحة: C
السؤال #17
In the planning of a new major manufacturing program, the greatest quality effort should be put logically in
A. nspection of product
B. ondestructive testing equipment
C. onconformance to specifications
D. revention of occurrence of substandard quality
عرض الإجابة
اجابة صحيحة: D
السؤال #18
Typically, a product that exhibits a constant failure rate follows what type of distribution for the failure rate?
A. Lognormal
B. Poisson
C. Exponentialcorrect
D. Binomial
عرض الإجابة
اجابة صحيحة: C
السؤال #19
Temperature measured in degrees centigrade is an example of what type of measurement scale?
A. Ratio
B. Nominal
C. Ordinal
D. Intervalcorrect
عرض الإجابة
اجابة صحيحة: D
السؤال #20
A in this drawing, the symbol is being used to indicate the
A. reference plane
B. basic definition
C. datumcorrect
D. feature
عرض الإجابة
اجابة صحيحة: C
السؤال #21
The table below shows the results of inspecting 3,752 items. On the basis of this information, a Pareto chart would show what cumulative percent of nonconformities by the end of the third operation? Calculator
A. 16
B. 21
C. 78
D. 90
عرض الإجابة
اجابة صحيحة: C
السؤال #22
A process is in control with a defect rate of 0.2%. A sampling plans calls for 30 items to be selected at random, and for the process to be shut down and corrected if any defects are found. How often will the process be shut down without a change in the defect rate?
A. 1
B. 5
C. 3
D. None of the above
عرض الإجابة
اجابة صحيحة: B
السؤال #23
An auditor who finds a major discrepancy during a pre-award audit of a new supplier should take which of the following actions?
A. Issue a stop-work request
B. Verify prompt corrective action
C. Investigate the cause of the discrepancy
D. Include the discrepancy in the final reportcorrect
عرض الإجابة
اجابة صحيحة: D
السؤال #24
Which of the following is NOT considered a prevention cost?
A. Writing operating procedures
B. Training
C. Data acquisition and analysis
D. Calibrating test equipment
عرض الإجابة
اجابة صحيحة: D
السؤال #25
Which of the following symbols indicates a termination point on a flowchart?
A. AOption A
B. BOption B
C. COption C
D. DOption D
عرض الإجابة
اجابة صحيحة: B
السؤال #26
The probability of accepting a lot of unacceptable quality is known as
A. Alpha risk
B. 1-beta
C. Producer's risk
D. Beta risk
عرض الإجابة
اجابة صحيحة: D
السؤال #27
Which of the following results is an advantage of a ship-to-stock program?
A. It replaces scheduled audits with incoming inspection
B. It reduces shipping costs
C. It reduces dock-to-line time
D. It reduces the need for purchaser supplier interaction
عرض الإجابة
اجابة صحيحة: C
السؤال #28
Which of the following quality system provisions is of the greatest concern when preparing an audit checklist for a vendor qualification system audit?
A. rawing and print control
B. akeup of the MRB
C. raining level of inspectors
D. alibration of test equipment
عرض الإجابة
اجابة صحيحة: D
السؤال #29
Which of the following quality gurus was very critical of merit-pay and individual bonuses? He discouraged management by objectives and the ranking of employees by performance.
A. Dr
B. Dr
C. Dr
D. Dr
عرض الإجابة
اجابة صحيحة: B
السؤال #30
The risk priority number (RPN) is determined by the
A. sum of reliability value, criticality number, and failure mode
B. sum of frequency of the occurrence, severity, and detection ratings
C. product of reliability value, criticality number, and failure mode
D. product of frequency of the occurrence, severity, and detection ratingscorrect
عرض الإجابة
اجابة صحيحة: D

عرض الإجابات بعد التقديم

يرجى إرسال البريد الإلكتروني الخاص بك والواتس اب للحصول على إجابات الأسئلة.

ملحوظة: يرجى التأكد من صلاحية معرف البريد الإلكتروني وWhatsApp حتى تتمكن من الحصول على نتائج الاختبار الصحيحة.

بريد إلكتروني:
رقم الواتس اب/الهاتف: