لا تريد أن تفوت شيئا؟

نصائح اجتياز امتحان الشهادة

آخر أخبار الامتحانات ومعلومات الخصم

برعاية وحديثة من قبل خبرائنا

نعم، أرسل لي النشرة الإخبارية

خذ اختبارات أخرى عبر الإنترنت

السؤال #1
What risk identification technique allows participants to identify the project risks and to remain anonymous?
A. Influence diagrams
B. Assumptions analysis
C. Surveys
D. Delphi technique
عرض الإجابة
اجابة صحيحة: D

View The Updated PMI-RMP Exam Questions

SPOTO Provides 100% Real PMI-RMP Exam Questions for You to Pass Your PMI-RMP Exam!

السؤال #2
A risk manager is confident that they have identified and quantified the risks and opportunities for aproject. When presenting their work to management, on what areas should the risk manager focus?(Choose two.)
A. isks that are tied to the success of the organization
B. isks as they apply to the organization's overall risk management philosophy and strategic ambition
C. uge opportunities that possibly bring an additional 30% return for 10 projects in the next year
D. isks related to cost that will impact the major projects that are currently in the execution phase
E. isk mitigation actions that will require work from stakeholders
عرض الإجابة
اجابة صحيحة: AB
السؤال #3
During the initial risk planning process, the risk manager and project manager discuss ways to handle known risks.Which project reserve should the project manager use to budget for known risks?
A. Budget reserve
B. Contingency reserve
C. Change management reserve
D. Risk reserve
عرض الإجابة
اجابة صحيحة: B
السؤال #4
A risk management professional is currently facilitating the risk planning process with the projectteam. To increase the breadth of considered risks, the team wants to include high-level and strategicproject risks.What should the risk management professional do next?
A. erform a sensitivity analysis to the higher-level aggregate activities
B. evelop a risk breakdown structure (RBS) identifying the potential risk categories
C. onduct a strengths, weaknesses, opportunities, and threats (SWOT) analysis
D. erform a base line Monte Carlo simul-ation to address overall threats to project objectives
عرض الإجابة
اجابة صحيحة: C
السؤال #5
When selecting strategies as an activity of Plan Risk Response, what is the overall goal? The overall goal of selecting strategies during the Plan Risk Response activity is to choose those strategies that have the greatest overall positive influence on the project, considering factors such as cost, schedule, and resources. According to the PMI Risk Management Professional (PMI-RMP) Examination Content Outline1, one of the tasks in the domain ofRisk Responseis to select risk response strategies based on the risk appetite and tolerance of the organization and stakeholders1. The overall goal of selecting risk response strategies is to select the strategies with the greatest overall positive influence on the project objectives, such as scope, schedule, cost, quality, etc.The risk response strategies should aim to enhance the opportunities and reduce the threats to the project, while considering the cost-benefit analysis, the feasibility, and the alignment with the project goals and stakeholder expectations2.The risk response strategies should not be selected based on the least overall impact to resources, because that may not be the most effective or efficient way to address the risks, and it may ignore the potential benefits of some strategies that may require more resources but also deliver more value3. The risk response strategies should not be selected based on the least financial impact, because that may not be the most relevant or comprehensive criterion to evaluate the risks, and it may overlook other aspects of the project, such as quality, customer satisfaction, reputation, etc.that may also be affected by the risks4.The risk response strategies should not be selected based on the greatest benefit to stakeholders, because that may not be the most realistic or achievable goal, and it may create conflicts or trade-offs among different stakeholder groups that may have different or competing interests, needs, and expectations5.Reference:1: PMI Risk Management Professional (PMI-RMP) Examination Content Outline, page 102: A Guide to the Project Management Body of Knowledge (PMBOK Guide) -- Sixth Edition, page 4403: A Guide to the Project Management Body of Knowledge (PMBOK Guide) -- Sixth Edition, page 4414: A Guide to the Project Management Body of Knowledge (PMBOK Guide) -- Sixth Edition, page 4425: A Guide to the Project Management Body of Knowledge (PMBOK Guide) -- Sixth Edition, page 518.
A. Select the strategies with the least overall impact to resources
B. Select the strategies with the least financial impact
C. Select the strategies with the greatest overall positive influence
D. Select the strategies with the greatest benefit to stakeholders
عرض الإجابة
اجابة صحيحة: C
السؤال #6
A cost analyst team member asks the project manager for the latest risk data for inclusion with the cost estimates for the project.Which tool should the cost analyst team member use to identify the probability of achieving specific cost targets?
A. Monte Carlo analysis
B. Decision tree analysis
C. Analogous estimating
D. Brainstorming
عرض الإجابة
اجابة صحيحة: A
السؤال #7
When processing freight invoices for a project, the project manager notices the shipping costsexceeded the budget due to increased fuel costs. The risk manager included this risk in the project'scontingency allowance. When reviewing the project budget execution reports, the project managernotices unused budget remaining in other closed tasks of the project that could cover the additionalshipping costs.What should the project manager do?
A. rocess the freight invoices at higher shipping costs against the project's contingency allowance
B. equest a formal change order from the customer to increase the project's total budget
C. rocess the freight invoices for the budgeted amount and hope the shipping company will forgive the difference
D. sk the project sponsor to cover the additional shipping costs on the company's reserves account
عرض الإجابة
اجابة صحيحة: A
السؤال #8
During project execution, the project team realizes that the power outlet for imported equipment is not compatible with the current customer's electrical infrastructure. This event was not originally identified as a risk. To maintain the project schedule, the project manager decides to purchase a new power adapter.What type of response best describes this course of action?
A. Contingency plan
B. Management plan
C. Fall-back plan
D. Workaround
عرض الإجابة
اجابة صحيحة: D
السؤال #9
After a risk review meeting, three key risks are identified as likely to be realized. The project manager requests a risk scenario be calculated to establish the impact on the budget.What is the forecasting methodology that should be utilized to calculate the impact?
A. Estimate to complete (ETC)
B. Budget at completion (BAC)
C. Estimate risk completion (ERC)
D. Estimate at completion (EAC)
عرض الإجابة
اجابة صحيحة: D
السؤال #10
Which of the following will ultimately determine risk thresholds?
A. The absolute value of the consequence
B. The risk appetite of the key stakeholders
C. The practice standard for risk management
D. The project manager
عرض الإجابة
اجابة صحيحة: B
السؤال #11
Which of the following could be included in risk monitoring and controlling techniques?
A. Status review meetings, trend analysis, earned value analysis, McGregor's analysis, defect repair, inspection
B. Status review meetings, variance analysis, trend analysis, earned value analysis, inspection, control charts
C. Status review meetings, control charts, Inspection, defect repair, Maslow's analysis, trend analysis
D. Variance analysis, trend analysis, earned value analysis, Maslow's analysis, control charts, brainstorming
عرض الإجابة
اجابة صحيحة: B
السؤال #12
A project with impending risks has 12 deliverables as subprojects, which will be executed in three different locations involving multiple stakeholders. What should the risk manager do to organize the prevailing risks?
A. se focus groups to conduct group risk assessments of the project to identify risks
B. se the external risk assessment of the project and its deliverables to identify risks
C. ombine individual and focus groups to identify risks and create the overall risk register
D. equest individual assessments of the project and its deliverables to identify risks
عرض الإجابة
اجابة صحيحة: C
السؤال #13
Which of the following characteristics would a risk tolerant person or group demonstrate?
A. Adaptable and resourceful; not afraid to take action; thrill seeking
B. Discomfort with uncertainty; low tolerance for ambiguity; seeks security and resolution in the face of risk
C. Risk taking is a price worth paying for future payoffs; seeks strategies and tactics that have high future payoffs; thinks abstractly and creatively envisioning possibilities, and not afraid of change or unknowns
D. Reasonable comfort with most uncertainty; accepts risk as a normal feature of projects and business, and takes uncertainty in stride with no apparent or significant influence on their behavior
عرض الإجابة
اجابة صحيحة: D
السؤال #14
Which of the following could be included in risk monitoring and controlling techniques?
A. Status review meetings, trend analysis, earned value analysis, McGregor's analysis, defect repair, inspection
B. Status review meetings, variance analysis, trend analysis, earned value analysis, inspection, control charts
C. Status review meetings, control charts, Inspection, defect repair, Maslow's analysis, trend analysis
D. Variance analysis, trend analysis, earned value analysis, Maslow's analysis, control charts, brainstorming
عرض الإجابة
اجابة صحيحة: B
السؤال #15
The project enters a testing phase to validate a project requirement. The testing is occurring in a common company testing area maintained by operations. The project team accepts the external customer's additional testing requirements, which may cause a slip in the schedule. A risk is identified, added to the risk register, and a response is developed.What is the next step to be completed?
A. Inform the external customer that the project manager has added the schedule risk to the register
B. Hire more resources to ensure the original schedule is maintained
C. Communicate and monitor the risk response with testing and operations
D. Resist the customer's scope increase to maintain the original testing requirements
عرض الإجابة
اجابة صحيحة: C
السؤال #16
Which of the following situational factors has a significant effect on risk attitude?
A. The risk heuristics evaluation available to the project team during planning and execution
B. The perception of probability or frequency of occurrence and the perception of impact magnitude
C. The number of project team members with close relationships to the chief executive officer (CEO)
D. The number of external stakeholders and the potential for indirect consequences
عرض الإجابة
اجابة صحيحة: D
السؤال #17
What is the purpose of mitigating negative risks as a part of the risk response process?
A. To transfer the probability of a risk happening to a third party, and to reduce the severity of the impact
B. To reduce the probability of a risk happening, and/or reduce the severity of the impact
C. To accept the probability of a risk happening to reduce the severity of the impact
D. To increase the probability of a risk happening, but reduce the severity of the impact
عرض الإجابة
اجابة صحيحة: B
السؤال #18
After a risk review meeting, three key risks are identified as likely to be realized. The project manager requests a risk scenario be calculated to establish the impact on the budget.What is the forecasting methodology that should be utilized to calculate the impact?
A. Estimate to complete (ETC)
B. Budget at completion (BAC)
C. Estimate risk completion (ERC)
D. Estimate at completion (EAC)
عرض الإجابة
اجابة صحيحة: D
السؤال #19
A risk has been identified in a multi-functional project. The project manager decides to take no action.What type of response is this considered?
A. Avoidance
B. Exploitation
C. Procrastination
D. Acceptance
عرض الإجابة
اجابة صحيحة: D
السؤال #20
A risk manager wants to determine which risks are going to have the highest impact on a project.Which of the following techniques should the risk manager use?
A. Assumptions analysis
B. Sensitivity analysis
C. Root cause analysis
D. Prioritization matrices
عرض الإجابة
اجابة صحيحة: B
السؤال #21
A project manager is hired as a consultant by the executive sponsor to manage a major change program that has experienced two past failures. The current executive sponsor believes the project is in good shape based on feedback from the last project manager and reports this to senior executive management. The executive sponsor believes there were no major risks threatening the time, budget, or quality of the project. In the first week of risk analysis, the project manager concludes the project timeline is unrealistic and is three months behind schedule. The organization's risk appetite is low.What is the first step that should be taken?
A. Review the project schedule and recommend fast tracking the schedule and/or crashing the critical path
B. Discuss the project schedule with the executive sponsor and agree on a strategy for updating the risk management plan and risk response plans
C. Update existing risk response plans and include more resources to get the project back on track
D. Immediately call a steering committee meeting, report the project status, and suggest project scope reductions to save time
عرض الإجابة
اجابة صحيحة: B
السؤال #22
During project execution, the project team realizes that the power outlet for imported equipment is not compatible with the current customer's electrical infrastructure. This event was not originally identified as a risk. To maintain the project schedule, the project manager decides to purchase a new power adapter.What type of response best describes this course of action?
A. Contingency plan
B. Management plan
C. Fall-back plan
D. Workaround
عرض الإجابة
اجابة صحيحة: D
السؤال #23
While developing a risk management plan for a complex program in a metricized environment, a program management team is itemizing a response plan for each identified risk that appears in the risk register. What should the risk manager do to effectively monitor the risks?
A. llow the most experienced program manager to handle the most critical program risks
B. resent the complicated nature of the program risk responses to the sponsor for proper advice
C. etermine the workarounds for the program risks and allocate responsibilities to the team
D. ncourage the program team to assume risk ownership prior to delegation
عرض الإجابة
اجابة صحيحة: D
السؤال #24
Which analysis method has a lower standard deviation?
A. European Hypercube
B. Monte Carlo simulation
C. Hecht analysis
D. Latin Hypercube
عرض الإجابة
اجابة صحيحة: D
السؤال #25
When using the risk register to manage the cost risk analysis, which of the following models the way correlation arises, and avoids the need to estimate the correlation coefficients?
A. Risk Monte Carlo analysis
B. Risk driver method
C. Risk scatter diagram
D. Risk RACI matrix
عرض الإجابة
اجابة صحيحة: C
السؤال #26
The company is a risk seeking organization, and has experienced measurable success based on their current strategy for growth. A new project has that exceeds the risk levels documented in the risk management plan.What would be the best course of action for the company to take with the project based on its current scope?
A. Monitor ongoing risks closely for any major changes
B. Perform a Monte Carlo simulation to understand possible risk outcomes
C. Cancel the project, as the overall level of risk remains unacceptable
D. Conduct a stakeholder meeting to validate stakeholder risk appetite
عرض الإجابة
اجابة صحيحة: C
السؤال #27
Which analysis method has a lower standard deviation?
A. European Hypercube
B. Monte Carlo simulation
C. Hecht analysis
D. Latin Hypercube
عرض الإجابة
اجابة صحيحة: D
السؤال #28
Which of the following characteristics would a risk tolerant person or group demonstrate?
A. daptable and resourceful; not afraid to take action; thrill seeking
B. iscomfort with uncertainty; low tolerance for ambiguity; seeks security and resolution in the face of risk
C. isk taking is a price worth paying for future payoffs; seeks strategies and tactics that have high future payoffs; thinks abstractly and creatively envisioning possibilities, and not afraid of change or unknowns
D. easonable comfort with most uncertainty; accepts risk as a normal feature of projects and business, and takes uncertainty in stride with no apparent or significant influence on their behavior
عرض الإجابة
اجابة صحيحة: D
السؤال #29
Which statement describes the risk portrayed on the risk matrix heat map below?
A. AThe risk has a probability of 60% of occurrence and a medium impact rating
B. BThe risk has a probability of 40% of occurrence and a high impact rating
C. CThe risk has a high impact and probability of occurring
D. DThe risk has a low probability and high impact rating
عرض الإجابة
اجابة صحيحة: B
السؤال #30
During project execution, the project team realizes that the power outlet for imported equipment is not compatible with the current customer's electrical infrastructure. This event was not originally identified as a risk. To maintain the project schedule, the project manager decides to purchase a new power adapter.What type of response best describes this course of action?
A. Contingency plan
B. Management plan
C. Fall-back plan
D. Workaround
عرض الإجابة
اجابة صحيحة: D
السؤال #31
The risk manager organizes a stakeholder meeting to obtain agreement on project risk response strategies. At the conclusion of this meeting, the risk response strategies should be which of the following?
A. cheduled, budgeted, and easy for project stakeholders to understand
B. ost-effective, validated by Monte Carlo analysis, and assigned
C. terative, scaled to the project, and addressing threats and opportunities
D. imely, cost-effective, agreed-upon, and accepted
عرض الإجابة
اجابة صحيحة: D
السؤال #32
A new resource is added to the project team from a matrix organization. How should the project's risk manager familiarize the new team member with the project's risk management process?
A. The functional manager is responsible for providing the training
B. Provide project specific risk training and mentor through the risk process
C. Send the new team member the risk management plan to read
D. Provide the new team member with a copy of the risk register and latest status report
عرض الإجابة
اجابة صحيحة: C
السؤال #33
A risk is identified early in the project. After six months, it is determined that the risk does not apply to this particular project.How should the risk be handled by the risk manager?
A. Ignore the risk and concentrate only on the pertinent risks
B. Remove the risk from the risk register and inform the project manager that it is no longer valid
C. Close the risk during the next risk board meeting and keep it in the risk register
D. Conduct a risk analysis to determine how an inappropriate risk was formally accepted
عرض الإجابة
اجابة صحيحة: B
السؤال #34
Who is ultimately responsible for monitoring a risk that is about to exceed its risk threshold?
A. Any project stakeholder
B. Project management office
C. Senior manager
D. Risk action owner
عرض الإجابة
اجابة صحيحة: D
السؤال #35
What is a project issue within a project environment?
A. negative effect on a project objective arising from occurrence of a threat
B. certain event which has a positive or negative impact in the project
C. risk which has a significant impact on the project
D. n uncertain event which may impact the project
عرض الإجابة
اجابة صحيحة: A
السؤال #36
A risk on the risk register is triggered. This triggered risk costs US$200,000 to mitigate and will overwhelm the project, causing it to fail if not mitigated. The project manager identifies that there is US$200,000 left in the management reserve.From which of the following sources should the funds be drawn to cover the risk mitigation?
A. Organization management reserve
B. Unplanned risk reserve
C. Contingency reserve
D. Management reserve
عرض الإجابة
اجابة صحيحة: C
السؤال #37
The project manager is implementing a computer interface to facilitate communications between two ticketing systems for two major companies in the IT industry. During the Plan Risk Response process, the project team agrees on the contingency plan that should mitigate the negative impact of the risk. However, during the project execution, one of the subject matter experts identifies a residual risk that was not taken into consideration during the risk response planning session, but could potentially affect the project schedule baseline.What should the risk manager do to handle this residual risk?
A. Increase the management reserve
B. Analyze this risk and update the risk register
C. Accept the risk, since it is minor
D. Reject the risk, since the risk plan will take care of all the risks
عرض الإجابة
اجابة صحيحة: B
السؤال #38
The project manager performed' a variance analysis on the project during the execution phase. The variances were shown as increasing What does this result imply? Increasing variances during the execution phase imply that the uncertainty and risk are increasing, as the project performance is deviating from the planned values. According to the PMBOK Guide -- Sixth Edition1, variance analysis is a technique used to compare the actual performance of the project against the planned or expected performance. It can be applied to various aspects of the project, such as scope, schedule, cost, quality, and risk. Variance analysis can help identify deviations from the baseline and determine the causes and impacts of those deviations. If the variances are shown as increasing, it means that the actual performance is deviating more and more from the planned performance, which implies that the uncertainty and risk are increasing. This could affect the project objectives and deliverables, and require corrective or preventive actions to bring the project back on track. The other options are not correct, as they are either too specific (B and D) or contradictory to the result of the variance analysis.Reference:PMBOK Guide -- Sixth Edition, pages 262-263.
A. The uncertainty and risk are increasing
B. The project schedule is lagging behind
C. There is no potential for future deviation
D. The project is over budget
عرض الإجابة
اجابة صحيحة: A
السؤال #39
What items should be included in a complex project's risk management plan?
A. Risk management methodology, scope statement, and thresholds and corresponding definitions
B. Risk management methodology, risk management organization, and thresholds and corresponding definitions
C. Risk management organization, templates, and milestone plan
D. Risk management organization, risk communication plan, and milestone plan
عرض الإجابة
اجابة صحيحة: B
السؤال #40
Which of the following represents levels of risk attitude?
A. Conservative, moderate, and liberal
B. Risk-averse, risk-neutral, risk-tolerant, risk-seeking
C. Risk-mitigating, risk-avoiding, risk-transferring, risk-accepting
D. High, medium, and low
عرض الإجابة
اجابة صحيحة: B
السؤال #41
The company is a risk seeking organization, and has experienced measurable success based on their current strategy for growth. A new project has that exceeds the risk levels documented in the risk management plan.What would be the best course of action for the company to take with the project based on its current scope?
A. Monitor ongoing risks closely for any major changes
B. Perform a Monte Carlo simulation to understand possible risk outcomes
C. Cancel the project, as the overall level of risk remains unacceptable
D. Conduct a stakeholder meeting to validate stakeholder risk appetite
عرض الإجابة
اجابة صحيحة: C
السؤال #42
The project manager is unable to obtain a global consensus of competing subject matter experts and stakeholders on the project scope. This has caused a one-month delay.What should the project manager do next to reduce further delay?
A. Initiate a scope change request
B. Schedule a project kick-off meeting
C. Schedule a stakeholder meeting
D. Engage the project sponsor/portfolio manager
عرض الإجابة
اجابة صحيحة: A
السؤال #43
A stakeholder is asked to approve additional funding to implement a risk response plan. However, the stakeholder is unsure of the amount that could be approved without escalation.Where should the stakeholder look to determine the amount that can be approved?
A. Project charter
B. Risk management plan
C. Risk register
D. Organizational process assets
عرض الإجابة
اجابة صحيحة: B
السؤال #44
What is the purpose of mitigating negative risks as a part of the risk response process?
A. To transfer the probability of a risk happening to a third party, and to reduce the severity of the impact
B. To reduce the probability of a risk happening, and/or reduce the severity of the impact
C. To accept the probability of a risk happening to reduce the severity of the impact
D. To increase the probability of a risk happening, but reduce the severity of the impact
عرض الإجابة
اجابة صحيحة: B
السؤال #45
During project execution, the project team realizes that the power outlet for imported equipment is not compatible with the current customer's electrical infrastructure. This event was not originally identified as a risk. To maintain the project schedule, the project manager decides to purchase a new power adapter.What type of response best describes this course of action?
A. Contingency plan
B. Management plan
C. Fall-back plan
D. Workaround
عرض الإجابة
اجابة صحيحة: D
السؤال #46
The project manager generates a monthly risk report for key stakeholders which documents high and medium risk items only.Where would the project manager find the list of recipients for the report?
A. Communications management plan
B. Risk management plan
C. Risk register
D. Project charter
عرض الإجابة
اجابة صحيحة: A
السؤال #47
What items should be included in a complex project's risk management plan?
A. Risk management methodology, scope statement, and thresholds and corresponding definitions
B. Risk management methodology, risk management organization, and thresholds and corresponding definitions
C. Risk management organization, templates, and milestone plan
D. Risk management organization, risk communication plan, and milestone plan
عرض الإجابة
اجابة صحيحة: B
السؤال #48
The risk manager loaded the risk register, built the risks into the simul-ation software, and ran the Monte Carlo analysis. The P80 and P90 end dates are the same as the deterministic date.What should be the risk manager ' s next step?
A. se the P90 date on the risk report
B. ecrease the risk consequences
C. heck the schedule for constraints
D. ecrease the number of iterations
عرض الإجابة
اجابة صحيحة: C
السؤال #49
Your project is an agricultural-based project that deals with plant irrigation systems. You have discovered a byproduct in your project that your organization could use to make a profit.If your organization seizes this opportunity it would be an example of what risk response?
A. Enhancing
B. Opportunistic
C. Positive
D. Exploiting
عرض الإجابة
اجابة صحيحة: D
السؤال #50
What are the supporting elements for effective risk management?
A. Trained core people, matrix organization, simple scalable process, and tools and techniques
B. Competent people, collaborative organization, rigorous process, and tools and techniques
C. Competent people, supportive organization, simple scalable process, and tools and techniques
D. Competent people, functional organization, policy, and tools and techniques
عرض الإجابة
اجابة صحيحة: C

View The Updated PMI Exam Questions

SPOTO Provides 100% Real PMI Exam Questions for You to Pass Your PMI Exam!

عرض الإجابات بعد التقديم

يرجى إرسال البريد الإلكتروني الخاص بك والواتس اب للحصول على إجابات الأسئلة.

ملحوظة: يرجى التأكد من صلاحية معرف البريد الإلكتروني وWhatsApp حتى تتمكن من الحصول على نتائج الاختبار الصحيحة.

بريد إلكتروني:
رقم الواتس اب/الهاتف:
Contact Us