السؤال #1
Which of the following activities should be classified as an internal failure cost?
A. Responding to customer satisfaction
B. Completing an internal audit
C. Shipping a maintenance build
D. Investigating the cause of build defects
عرض الإجابة
اجابة صحيحة: D
السؤال #2
Which of the following problem - solving tools is most appropriate for breaking down ideas into progressively greater detail?
A. Tree diagram
B. Matrix diagram
C. Affinity diagram
D. Relationship diagram
عرض الإجابة
اجابة صحيحة: A
السؤال #3
Which of the following tools should be used to identify the steps in the development process that are the source of the most software defects?
A. ARun chart
B. BPareto chart
C. CScatter diagram
D. DControl chart
عرض الإجابة
اجابة صحيحة: B
السؤال #4
Which of the following measures would a project manager use to assess the team’s progress against the project schedule?
A. Function point metric
B. Earned value analysis
C. SMART metrics
D. COCOMO H Model
عرض الإجابة
اجابة صحيحة: B
السؤال #5
In lean software development extra features should be identified as
A. potential re-use elements
B. an internal cost of quality
C. defects
D. waste
عرض الإجابة
اجابة صحيحة: D
السؤال #6
What type of information should a project's configuration status accounting communicate?
A. Budget updates for the project
B. Changes to the project plan
C. Activity on baselined items
D. Change control board minutes
عرض الإجابة
اجابة صحيحة: C
السؤال #7
How does reverse engineering differ from software reengineering?
A. Reverse engineering involves creating new software components
B. Reverse engineering aims to understand and analyze existing software
C. Software reengineering focuses on understanding the existing software's structure
D. Software reengineering is used for hardware design
عرض الإجابة
اجابة صحيحة: B
السؤال #8
Which of the following aspects of information systems is disaster recovery primarily concerned with protecting?
A. Integrity
B. Availability
C. Authorization
D. Confidentiality
عرض الإجابة
اجابة صحيحة: B
السؤال #9
Which of the following actions can a company take to reduce the risk associated with integrating a commercial off-the-shelf (COTS) spreadsheet package into its own software product?
A. Require the vendor to adhere to the licensing agreement for product fixes
B. Audit the vendor's quality system
C. Require the vendor to place the object code into escrow
D. Test the product to determine whether it satisfies critical functions
عرض الإجابة
اجابة صحيحة: D
السؤال #10
Which of the following information is considered part of the software baseline?
A. Test logs
B. Test plan and test cases
C. User survey and their results
D. Software metrics and summarized data
عرض الإجابة
اجابة صحيحة: B
السؤال #11
In the context of Six Sigma, what does the "Define" phase focus on?
A. Collecting data on current processes
B. Implementing solutions to process problems
C. Identifying and defining the problem
D. Monitoring the process improvements
عرض الإجابة
اجابة صحيحة: C
السؤال #12
Which of the following inputs is used in software cost estimation models?
A. ALines of code
B. BNumber of users
C. CAge of the software
D. DMaintenance requirements
عرض الإجابة
اجابة صحيحة: A
السؤال #13
The long-term success of a software subcontractor is dependent on which of the following factors?
A. AProfit margin
B. BCustomer satisfaction
C. CProductivity levels
D. DTechnology trends
عرض الإجابة
اجابة صحيحة: B
السؤال #14
Software security is developed to address which of the following types of communication threats?
A. Intentional attacks
B. Unintentional attacks
C. Physical attacks
D. Natural disasters
عرض الإجابة
اجابة صحيحة: A
السؤال #15
A static analysis tool is used to
A. Aensure that the system meets customer expectations
B. Bidentify potential problems
C. Ctrace test cases
D. Dimprove the time to market
عرض الإجابة
اجابة صحيحة: B
السؤال #16
Return on Investment (ROI) is an important metric in software quality management. Which of the following best describes ROI?
A. The ratio of net profit to the total investment cost
B. The cost associated with identifying defects in the product
C. The costs resulting from delivering defective products to customers
D. The costs incurred to train employees
عرض الإجابة
اجابة صحيحة: A
السؤال #17
Which of the following steps comes first during release planning for waterfall-type projects?
A. Define the scope of the software being developed
B. Determine which problems will be corrected in the next release
C. Select the set of requirements that will be included in the release
D. Confirm the implemented software meets the specified requirements
عرض الإجابة
اجابة صحيحة: A
السؤال #18
Which of the following describes when a test plan should be changed?
A. After product stability has been assessed
B. After changes to the design specifications
C. After each code review
D. When the configuration management tool is updated
عرض الإجابة
اجابة صحيحة: B
السؤال #19
Which skills are essential for managing virtual, in-person, and hybrid teams? (Choose two)
A. Clear communication
B. Micromanagement
C. Flexibility in scheduling
D. Centralized decision-making
عرض الإجابة
اجابة صحيحة: AC
السؤال #20
Which of the following are benefits of implementing software quality engineering at the organizational level? (Choose two)
A. Improved product reliability
B. Increased market competition
C. Enhanced customer satisfaction
D. Higher development costs
عرض الإجابة
اجابة صحيحة: AC
السؤال #21
Which of the following categories describes acquirer-type stakeholders?
A. ADistributors: developers, suppliers
B. BDistributors, suppliers, users
C. CIndirect user, direct user, customers
D. DIndirect user, direct user, distributor
عرض الإجابة
اجابة صحيحة: C
السؤال #22
When evaluating requirements, which aspects are essential to assess? (Choose thre.)
A. Completeness?
B. Consistency?
C. Aesthetics?
D. Testability?
عرض الإجابة
اجابة صحيحة: ABD
السؤال #23
When evaluating risks related to software security, what should be included in the response plan to minimize their impact? (Choose thre.)
A. Incident response procedures
B. Regular system backups
C. Clear communication channels
D. Employee satisfaction surveys
عرض الإجابة
اجابة صحيحة: ABC
السؤال #24
What type of information should a project's configuration status accounting communicate?
A. ABudget updates for the project
B. BChanges to the project plan
C. CActivity on baselined items
D. DChange control board minutes
عرض الإجابة
اجابة صحيحة: C
السؤال #25
What are key facilitation skills for managing and resolving conflicts? (Choose two)
A. Dictating solutions
B. Using negotiation techniques
C. Ignoring the issue
D. Employing conflict resolution skills
عرض الإجابة
اجابة صحيحة: BD
السؤال #26
In agile development, requirements changes are
A. discussed and incorporated during the daily stand up
B. implemented in the next sprint to enable rapid feature delivery
C. added to the product backlog and prioritized by the product owner
D. reviewed and approved by stakeholders in a configuration control board
عرض الإجابة
اجابة صحيحة: C
السؤال #27
Which of the following statements is true about open source software (OSS)?
A. AThere is no risk involved when testing OSS
B. BModifications to OSS do not need to be tested
C. COSS can always be modified without significant repercussions
D. DOSS can be problematic when it comes to keeping up with changes
عرض الإجابة
اجابة صحيحة: D
السؤال #28
What is the main goal of conducting code reviews and inspections?
A. To slow down the development process
B. To identify defects early
C. To train new developers
D. To prepare for deployment
عرض الإجابة
اجابة صحيحة: B
السؤال #29
From the auditor's perspective, which of the following actions will result in a successful internal audit?
A. Reporting as many deficiencies as possible
B. Completing each item on the checklist
C. Recommending corrective action for each deficiency noted
D. Obtaining management cooperation and support
عرض الإجابة
اجابة صحيحة: D
السؤال #30
Globalization requirements involve
A. defining the required information flow across shared interfaces to external entities
B. defining problems to be solved or opportunities to be addressed by the software product
C. looking at the capability of the software product from the perspectives of various stakeholders
D. developing software that can be adapted to target markets and customizing software for those markets
عرض الإجابة
اجابة صحيحة: D

عرض الإجابات بعد التقديم

يرجى إرسال البريد الإلكتروني الخاص بك والواتس اب للحصول على إجابات الأسئلة.

ملحوظة: يرجى التأكد من صلاحية معرف البريد الإلكتروني وWhatsApp حتى تتمكن من الحصول على نتائج الاختبار الصحيحة.

بريد إلكتروني:
رقم الواتس اب/الهاتف: