Typically the highest cost for warehousing is the cost related to:
A. ace
B. bor
C. uipment for materials handling
D. e information system
عرض الإجابة
اجابة صحيحة: A
السؤال #2
Which of the following considerations is valid when selecting a mode of transportation?
A. nancial viability of the supplier
B. ansit time consistency
C. nership of equipment
D. e of equipment
عرض الإجابة
اجابة صحيحة: B
السؤال #3
Providing customers with what they want at low cost describes the relationship between which of the following?
A. QM and production planning
B. QM and CRP
C. IT and TQM
D. RP II and JIT
عرض الإجابة
اجابة صحيحة: C
السؤال #4
A company produces a part with a nominal diameter of 2. inches and a tolerance of 0.06 with a standard deviation of 0.01 inches.A sample has the average diameter of1.96 inches with a standard deviation of 0.01 inches.What is the CPK and process capability?
A.
B.
C.
D.
عرض الإجابة
اجابة صحيحة: B
السؤال #5
When forecasting the demand for a product, the highest percentage of error will occur at the:
A. ster schedule
B. rket segment
C. ntral warehouse
D. eld warehouses
عرض الإجابة
اجابة صحيحة: D
السؤال #6
Which plant type describes a product at one stage that can be transformed into several distinct products at the next stage (divergent points)?
A. -Plant
B. -Plant
C. -Plant
D. -Plant
عرض الإجابة
اجابة صحيحة: D
السؤال #7
The end items and quantities to be produced by period are defined by which of the following?
A. trategic business plan
B. roduction plan
C. aster production schedule
D. ispatch list
عرض الإجابة
اجابة صحيحة: C
السؤال #8
What is the major disadvantage of a fixed location warehouse?
A. ut away time is increased
B. ube utilization is poor
C. ock time is increased
D. aterial handling costs rise
عرض الإجابة
اجابة صحيحة: B
السؤال #9
Which process converts the sales and operations plan into gross labor hours, floor space, and machine hours?
A. source planning
B. ugh cut capacity planning
C. pacity requirements planning
D. nite load planning
عرض الإجابة
اجابة صحيحة: A
السؤال #10
Which of the following is used to manage queues and lead times?
A. orward scheduling
B. ough-cut capacity planning
C. aterial requirements planning
D. nput/output control
عرض الإجابة
اجابة صحيحة: D
السؤال #11
What is the MOST critical factor if a company is going to achieve manufacturing excellence?
A. uality improvement
B. ost reductions for the customer
C. 00% on time delivery
D. bility to increase/decrease volume at will
عرض الإجابة
اجابة صحيحة: A
السؤال #12
To provide the required level of customer service, to minimize the costs of transportation and handling, and to interact with a factory to minimize scheduling problems are all objectives of:
A. terprise resources planning
B. stribution inventory management
C. les and operations planning
D. stomer relations management
عرض الإجابة
اجابة صحيحة: B
السؤال #13
Which of the following manufacturing systems involves the creation of one unit or a small number of units?
A. ow manufacturing
B. termittent manufacturing
C. oject manufacturing
D. ntinuous manufacturing
عرض الإجابة
اجابة صحيحة: C
السؤال #14
Which of the following items is required for making realistic customer promises?
A. easible master schedules
B. rocedures for managing abnormal demand
C. inished-goods safety stock
D. sales and operations planning process
عرض الإجابة
اجابة صحيحة: A
السؤال #15
How would a master production schedule (MPS) be used in an assemble-to-order (ATO) manufacturing environment?
A. e MPS is used to plan subassemblies and components; end items are only scheduled when a customer order is received
B. bassemblies are scheduled in the MPS when the customer order is received, and production can start
C. pically, the MPS is not used in companies using an ATO manufacturing strategy
D. ten in an ATO environment, the MPS is created once a year and only revised if a product is discontinued
عرض الإجابة
اجابة صحيحة: A
السؤال #16
The most appropriate approach for developing forecasts for strategic business planning is:
A. ustomer inputs
B. uantitative statistical methods
C. conomic growth models
D. asual analysis
عرض الإجابة
اجابة صحيحة: C
السؤال #17
Which of the following statements about the MRP due date for a shop order is true?
A. t is the same as operation priority
B. t is used in deriving operation priority
C. t is established at order release time and frozen until order completion
D. t is equal to the due date plus 5 "M" days
عرض الإجابة
اجابة صحيحة: B
السؤال #18
Which of the following manufacturing processes would be characterized by a narrow range of standard products, low direct labor costs, and a high level of technical support for manufacturing?
A. obbing
B. ntermittent
C. low
D. roject
عرض الإجابة
اجابة صحيحة: C
السؤال #19
Key linkages managed by distribution requirements planning within the supply chain include links to:
A. orecasted demand and material requirements planning
B. ogistics systems and demand management
C. ustomers only
D. endors only
عرض الإجابة
اجابة صحيحة: B
السؤال #20
Which of the following is the primary role for demand management?
A. roviding a tool for aggregation and disaggregation of demand
B. inking the production plan to MRP
C. roviding input to the master schedule
D. ynchronizing of market activities and the production plan
عرض الإجابة
اجابة صحيحة: D

عرض الإجابات بعد التقديم

يرجى إرسال البريد الإلكتروني الخاص بك والواتس اب للحصول على إجابات الأسئلة.

ملحوظة: يرجى التأكد من صلاحية معرف البريد الإلكتروني وWhatsApp حتى تتمكن من الحصول على نتائج الاختبار الصحيحة.

بريد إلكتروني:
رقم الواتس اب/الهاتف: