1.VACL is wrong,change access-list ,no seq 10 and no seq 30
2.no ip ospf cost 9 (the interface of SW111 connect R15)
3.R23 loopback: OSPF process is wrong ,change OSPF 10 to OSPF 1
R22 and R23 use origina to control path, compare R12 and R13
SW210 ping 10.254.101.1 one of the hop is wrong ,,R13 interface add ip os cost 11
4. R21 had config LP,but do not use it
5. R60 tunnel mask is /32,change to /24
6. SW111, OSPF DO NOT network VLAN 2001,
R15 redistribute OSPFv3 to BGP

7.R10 ospf config “DISTANCE OSPF EXTERNAL 19” ,change 19 to219.
R3 RT import wrong,R5 lo0 network wrong ospf process
8. SW300,SW301,SW310. add “IP ARP INSPECTION TRUST” Under PORT-CHANNEL.
9.R24 change tunnel interface ospf network,ip os net p2mp change to p2p
10.
ip nat inside source static 123.45.67.100 10.2.200.1
Change to
ip nat inside source static 10.2.200.1 123.45.67.100

ip nat inside source static 201.99.70.2 201.99.25.70
Change to
ip nat outside source static 201.99.70.2 201.99.25.70



Cisco Pass Report View More >

CCIE Security Written
Jul 18, 2019
CCIE Security Written
CCIE RS Written
Jul 18, 2019
CCIE RS Written
CCIE RS Written
Jul 18, 2019
CCIE RS Written
CCIE Security Written
Jul 18, 2019
CCIE Security Written
CCIE RS Lab
Jul 18, 2019
CCIE RS Lab
CCIE Data Center Written
Jul 17, 2019
CCIE Data Center Written
CCIE Security Lab
Jul 17, 2019
CCIE Security Lab
CCIE SP Lab
Jul 17, 2019
CCIE SP Lab
CCIE RS Written
Jul 17, 2019
CCIE RS Written
CCIE RS Written
Jul 17, 2019
CCIE RS Written